P 7
Please retain product label and instructions for future reference
2
4
IMPORTANT :
Pre-drill before fixing screws.
Step 8
Parts Needed - No. 2 QTY 3
No. 3 QTY 3
No. 4 QTY 3
No. 5 QTY 3
Arrange the left, right, top & bottom window
frames (
No’s. 2, 3, 4,& 5
) onto a firm and level
surface. Secure the top and bottom frames to
the uprights using 2x80mm screw per corner,
ensuring the screws do
NOT
protrude through
the front of the window framing.
Use this method to construct 3 window frames.
24x80mm Screws
Pre drill
hole
80mm
screw
5
3
5
3
The lip of the door frame should
be postioned on the inside of
the building.
.
Step 9
Once you have laid the second level of
boards onto the log cabin slide the
windows between the smaller boards
and rest on to the longer board
(if you
have not yet
assembled the window frames refer to
step 8)
*Ensure the boards are level with each
end.
*Please note:
This image is for
illustrative purposes and may differ from
your choice in product (
regarding
window position
).
Nevertheless the process of fitting the
window is the same
Step 10
Parts Needed - No. 25 QTY 6
No. 26 QTY 6
No. 27 QTY 12
No. 29 QTY 12
No. 30 QTY 12
Following the method shown in the
illustration, lay a further 6 boards
(
No.25, 26, 27, 29 & 30
) onto the log
cabin to bring the board level to the
top of the window and door frames.
*Ensure that the boards are level
and flush with each other as you lay
each one.
25
26
27
30
29
27
29
30