![Mercia Garden Products 0619PNNE0403HGDD3SW-V1 Скачать руководство пользователя страница 15](http://html1.mh-extra.com/html/mercia-garden-products/0619pnne0403hgdd3sw-v1/0619pnne0403hgdd3sw-v1_manual_1772562015.webp)
P 15
Please retain product label and instructions for future reference
Pre drill
hole
60mm
bolt
44
44
Step 27
Parts needed - No. 44 QTY 8
Arrange the storm braces
(No.44)
around the building (
internally
),
Placing 2xStorm braces per side, fixing
into place using 2x 60mm bolts per
brace ,making sure the washer & nut
are tightened from the outside of the
building.
*Ensure the storm braces are secured
at the highest point possible on each
side.
The storm braces will need to be
altered during the buildings life as the
moisture content within the log boards
changes. The boards will expand
during periods of high moisture
(Winter) and shrink during periods of
low moisture (Summer.)
**Storm braces will help your building
expand and contract properly.
***Important: Ensure each bolt is
tightened using a washer so as not to
damage the log boards.
16x60mm Bolt Sets
IMPORTANT :
Pre-drill before fixing screws.
Step 28
Parts Needed: No. 6 QTY 3
No. 16 QTY 1
Attach the Rain Guards
(No. 6)
to the Window
frame, fixing in place onto the framing above
the window using 3x70mm screws per guard.
Attach the Rain Guard
(No. 16)
to the Door
frame, fixing in place onto the framing above
the Door using 3x70mm screws.
12x70mm Screws.
70mm
screw
Pre drill
hole
6
16
6
6
IMPORTANT :
Pre-drill before fixing screws.
6
AFTER TREATMENT:
score around protective
cover on glazing and
carefuly peel
covering back
It is ESSENTIAL that you apply wood
treatment immediately after the building
has been assembled.
SILICONE
SEALANT
It is ESSENTIAL to seal around all
window framing with sillicone
sealant (not included) to
minimise water ingress.