background image

P 5

Please retain product label and instructions for future reference

             

24

26

Pre drill 

hole

70mm 

screw

24

IMPORTANT: 

Pre-drill before fixing screws.

Step 3

Parts Needed - No. 24 QTY 2

                                 No. 26 QTY 2

Place the starter boards 

(No. 24)

 on to assembled base frame along the 

longest sides  and place the first two log boards 

(No. 26)

 

in the notch as 

shown.

Ensure the boards sit square on the base using the same method used 

in Step 1. Measure corner to corner, making sure the measurements are

equal.

Once the boards are square, lift up  the log board 

(No. 26)

 and fix the 

starter boards in place.

Fix each of the starter boards to the frame by screwing through the 

notch into the frame as shown  in the illustration.

4x70mm Screws

24

26

25

26

26

28

28

Step 4

Parts Needed - No. 25 QTY 6

                                 No. 26 QTY 10

                                 No. 28 QTY 12 

Following the method shown in the 

illustration, lay the first 6 boards 

(

No. 25, 26, & 28

Start by placing the front and back 

boards, interlocking them with the side 

boards. Then place the next side boards, 

interlocking with the front and back 

boards.  Continue this method until you 

have placed

 6 boards off of the starter 

boards on each side, 

as shown in the 

illustration.

This will create your first level.

*Ensure that the boards are level and 

flush with each other as you lay each 

one.

Содержание 0619PNNE0403HGDD3SW-V1

Страница 1: ...rm sunshine and sheltered as much as possible during rain or snow BUILDING A BASE When thinking about where the building and base are going to be constructed Ensure that there will be access 60cm to a...

Страница 2: ...m 71x70x805mm Qty 3 AI 0619LOGSWBF V3 7 6 Inch T Hinge QTY 6 PI 07 0113 8 Casement Stay Qty 3 PI 07 0008 Double Door Contents 10 9 11 12 Mortice Lock Qty 1 PI 07 0017 Key Plate Qty 1 Handles Pair Qty...

Страница 3: ...00x2mm 43 Log Board 120x19x2996mm QTY 25 LB19 A 2996 Finisher Board 54x19x4000mm QTY 1 LB19RG54 A 4000 Finisher Board 50x19x4000mm QTY 1 LB19RG50 A 4000 Log Board 120x19x1216mm QTY 12 LB19 B 1216 Log...

Страница 4: ...tal ensuring the bearers are flush Once fully assembled ensure the bearers are square by measuring from corner to corner as illustrated making sure the measurements are equal If the bearers are not al...

Страница 5: ...No 26 and fix the starter boards in place Fix each of the starter boards to the frame by screwing through the notch into the frame as shown in the illustration 4x70mm Screws 24 26 25 26 26 28 28 Step...

Страница 6: ...door section slide the assembled door frame over the boards resting the frame on top of the starter board if you have not yet assembled the door frame refer to step 5 Please note This image is for il...

Страница 7: ...Step 9 Once you have laid the second level of boards onto the log cabin slide the windows between the smaller boards and rest on to the longer board if you have not yet assembled the window frames ref...

Страница 8: ...ired to fit parts 70mm screw Step 12 Parts Needed No 22 QTY 2 No 25 QTY 1 No 34 QTY 1 Following the method shown in the illustration place the first boards from the gable No 22 and the remaining Log b...

Страница 9: ...de as shown in the illustration Ensure to stagger the screws so as not to collide with the previous screw 2x70mm Screws 2x30mm Screws Pre drill hole 33 30mm screw Rubber Mallet may be required to fit...

Страница 10: ...oards by 2mm each end You have been issued with 37 roof boards but in reality you may only need to use 36 The last roof board will overhang past the end of the roof purlin Using a straight edge and a...

Страница 11: ...o 8 onto the window No 1 and the casement stay pins to the window framing using 6x30mm black screws Ensure the casement stay is centralised on the window Use this method to fit one casement stay to ea...

Страница 12: ...is for illustrative purposes and may differ from your choice in product regarding ironmongery Nevertheless the process of fixing the frames is the same 8x30mm Black Screws 4x30mm Screws a b 30mm scre...

Страница 13: ...h of the floor boards into the floor bearers 280x40mm Screws IMPORTANT Pre drill before fixing screws Closure Trim Internal 23 Measure and cut the closure trims to fit the internal space Closure Trim...

Страница 14: ...ls Felt size 4100mm L X 1000mm W 210x Felt Tacks 1 2 3 45 4 40mm screw Pre drill hole 38 39 38 Step 26 Parts Needed No 38 QTY 2 No 39 QTY 2 Attach the fascia s No 38 39 around the building ensuring to...

Страница 15: ...r building expand and contract properly Important Ensure each bolt is tightened using a washer so as not to damage the log boards 16x60mm Bolt Sets IMPORTANT Pre drill before fixing screws Step 28 Par...