![Mercia Garden Products 0619PNNE0403HGDD3SW-V1 Скачать руководство пользователя страница 14](http://html1.mh-extra.com/html/mercia-garden-products/0619pnne0403hgdd3sw-v1/0619pnne0403hgdd3sw-v1_manual_1772562014.webp)
P 14
Please retain product label and instructions for future reference
HANDLE
WITH CARE
1
2
3
4
Felt
tacks
Step 25
Parts needed - No. 45
Cut the felt into four strips of:
4100mm (L) X 1000mm (W)
and lay
onto the roof in the order shown in the
illustration.
*Ensure there is approximately 50mm
of overhanging felt each side.
Once the felt is laid out fix to the roof
using felt tacks at 100mm intervals.
*Felt size: 4100mm (L) X 1000mm (W)
210x Felt Tacks
1.
2.
3.
45
4.
40mm
screw
Pre drill
hole
38
39
38
Step 26
Parts Needed - No. 38 QTY 2
No. 39 QTY 2
Attach the fascia’s (
No. 38 & 39
) around
the building (
ensuring to trap the felt
in between the fascia’s
) securing into
place using3x40mm screws per fascia.
Ensure the fascia at the back of the log
cabin sits level or lower than the felt to
allow water to run off.
*Once in place mark the excess fascia
with a pencil and trim the fascias to
follow the shape of building as shown
in the illustration.
12x40mm Screws
39
IMPORTANT :
Pre-drill before fixing screws.