
106
Towing
Guidelines for Breakdown Services (Subject to technical modifications)
i
Towing
왘
Connect compressed air supply line of towing ve-
hicle (red coupling head) to tire inflation
connection
3
or to front coupling head.
A reservoir pressure of 10 bar is required.
A reservoir pressure of 8.5 bar is required.
If the spring-loaded parking brake cannot be reliably released pneumatically, release it mechanically,
see page 83.
!
When filling directly at four-circuit protection
valve: Test connection 22 for rear axle brake
circuit, test connection 21 for front axle brake
circuit.
On vehicles with continuous brake systems, note
that the brake force at the towed vehicle may be
relatively high/low depending on the vehicle
load and the type of brake system.
Install a manual brake force regulator if
necessary.
Содержание Atego
Страница 2: ......
Страница 130: ......
Страница 131: ...Towing Recovery Atego Daimler AG GSP OI HPC R 822 D 70546 Stuttgart Technical status 10 2008 Towing Recovery...