Installation
42
03-11-24
1003en01
6.
Remove the grounding wire at the rear of the cover plate.
7.
Remove all transport guides at the pinch valves. These guides are red co-
loured plastic clamps inserted in each valve. Save them for later use in case
of a re-installation.
8.
Re-assemble the front cover in reverse order. Be sure to reconnect the
ground-wire!
Reagent pack installation
1.
Place the reagent pack in the proper place. See
Reagent packages
on page
40.
2.
Put the probes as shown below (the example shows the lyzer container).
1025.tif
1026.tif
Transport guides
Important
One valve is located be-
hind the pre-dilute start le-
ver MPA. Do not forget to
remove the transport
guides in this valve.
The instrument will not
operate correctly in case a
transport guide is not re-
moved. Possible conse-
quences of not removing
all transport guides are:
Indication numbers, incor-
rect parameter results and/
or incorrect counting
times.
1027.bmp
Содержание CA530
Страница 2: ......
Страница 6: ...6 03 11 24 ...
Страница 24: ...Specifications 24 03 11 24 1001en01 ...
Страница 38: ...Parameter Flags 38 03 11 24 1002en01 ...
Страница 80: ...Warning Displays 80 03 11 24 1008en01 ...
Страница 92: ...QC and Blood Controls 92 03 11 24 1156en01 ...
Страница 98: ...Maintenance Shut Down Transport 98 03 11 24 1011en01 ...
Страница 107: ......