MultiTest
-dV
Operating Manual
Mecmesin
33
Setting
Options
Start Direction
Choose whether the test direction is upward or downward.
Move to Start
Select if the test moves to the start position first.
Example
Upper displacement:
+10 mm
Lower displacement:
–
20 mm
Initial stroke
:
Up
Move to Start:
Yes
Unless already at -20 mm the crosshead will first travel to that point. The stand will then
move to 10 mm above tared zero, followed by a final movement back to -20mm.
AFG Control/Force Control
The AFG control test operation consists of two main functions:
AFG Control -
Control of the test stand using the AFG’s limit or break settings,
Force Control -
Control of the test stand using the front panel to program limit,
break or cycle settings,
Within AFG Control/Force Control there are four subtests:
Sub-Test
Description
AFG Control
Move in a set direction until a force limit or break condition is hit
and then stop. Configured using the AFG.
Force Limit
Move in the configured direction until a force limit is hit and then
stop. Configured using the front panel.
Force Cycle
Cycle between a limit force and a return force. Configured using
the front panel.
Break
Move in the configured direction until a break condition is detected.
Configured using the front panel.
Содержание MultiTest 0.5-dV
Страница 1: ...MultiTest dV Tension and Compression Test Stand Operating Manual 431 459 04 February 2019 ...
Страница 44: ...44 Mecmesin MultiTest dV Operating Manual MultiTest dV 1 0kN Dimensions Note The above drawing is not to scale ...
Страница 45: ...MultiTest dV Operating Manual Mecmesin 45 MultiTest dV 0 5kN Dimensions Note The above drawing is not to scale ...
Страница 46: ...46 Mecmesin MultiTest dV Operating Manual 11 Declaration of Conformity ...
Страница 51: ...MultiTest dV Operating Manual Mecmesin 51 14 Operator Notes ...