4 - 8
Operation - Auto Fusion
Auto Fusion (continued)
View Joint Report:
The joint report has 4 screens of information about the recorded
fusion joint. Use the Next>> and <<Back buttons to scroll between
the 4 screens.
The information in the joint report shown here is performed under
simulation and may not reflect actual fusion joint information.
1 Location/project details: -
Previously entered information (optional).
2 Date/Time: -
When the fusion joint was made.
3 Joint Number: -
The number given to the recorded fusion joint. As
other joints are made, the number will increment to the next number.
4 Job Number: -
Number given to the job the fusion joint was made
under.
5 Employee Payroll No.: -
Employee or operator number for personnel
performing the fusion joint.
6 Passport/EUSR: -
Number for UK gas reference.
7 McElroy ID: -
ID number given to McElroy qualified operators.
8 Machine ID: -
Identification number for the fusion machine.
9 Machine Model: -
Fusion machine model used to perform the fusion.
10 Piston Area: -
The total effective piston area of the machine.
11 Fusion Spec: -
The specification or standard used to perform the
fusion.
12 Pipe Size: -
The size of the pipe that was fused and the material of
the pipe that was fused.
13 Joint Status: -
Completed, aborted, failed, dummy.
14 Heater: -
Displays the target temperature from the fusion specification
and the actual temperature that was recorded.
15 Heat: -
Displays the target and actual heating pressures and times.
16 Soak: -
Displays the target and actual soak pressures and times.
17 Open/Close: -
Displays the target and actual open/close times.
18 Fuse: -
Displays the target and actual fusing pressures and times.
19 Cool: -
Displays the target and actual cooling pressures and times.
20 Drag Pressure: -
Recorded drag pressure.
PH0
55
67
-06
-3
0-16
PH0
55
68-06
-3
0-16
PH0
56
07
-06
-3
0-16