Operation - Auto Fusion
4 - 5
Auto Fusion (continued)
Enter any location or project details (optional). These details will
be displayed in the joint report.
• Press
to change the location/project details.
• Tap
Yes>>
to proceed with these location/project details.
Prepare for Fusion:
Refer to "Operation - General" section for details on pipe facing
and Hi/Lo alignment check.
• Tap
Next>>
when the pipe has been prepared for fusion.
Input any notes about the fusion joint (optional). The notes can be
appended after the fusion joint is complete. Tap
Enter>>
.
Take one photo of the pipe (optional) before the fusion.
• Tap the zoom icon
to change the zoom of the photo.
• Tap the camera icon
to capture a photo.
• Tap the trash icon
to delete the photo taken.
•
Tap
Next>>
to proceed.
PH0
55
46
-0
4-06
-17
PH0
56
00
-0
4-06
-17
PH0
55
47
-06
-3
0-16
PH0
55
45-0
4-06
-17