Oper
ation - Sock
et
Fuse to Outlet
5 - 4
Operation - Socket Fuse to Outlet
Hornet™ XL
Remove Hornet™ XL
After completing the specified cooling time, inspect the joint
for compliance with the appropriate joining standard.
There should be no gaps or voids between the fitting and the
pipe.
If the joint is not acceptable, cut out the pipe section and fuse
a new pipe in the removed section.
1)
Open the jaws of the carriage.
2)
Remove the machine from the main pipe by loosening
the chains on the tailstock and removing the chains
from the chain brackets. Lift the machine away from the
pipe.
IMPORTANT:
Support the machine while unclamping to
avoid the machine falling or swinging around the main pipe.
CD02470-03-15-19
TX05401-03-15-19
Содержание Hornet XL ASW31401
Страница 29: ...Storage Transport 6 2 Storage Transport Hornet XL Hornet XL Storage Case with All Items Stored ...
Страница 33: ...Notes 9 1 Notes Hornet XL NOTES Notes ...
Страница 34: ......