Final Check:
1.
Open outlet ball valve on UV unit.
2.
Make sure the MWC-EM UV Unit is plugged into a surge protector
(not provided) then a dedicated electrical outlet with power 24
hours per day.
3.
Check all piping for leaks, repair if necessary.
4.
Unplug the 1” normally closed solenoid from the electrical outlet
and plug the solenoid into the lower right side of the UV Meter
Supply.
5.
Open cold water lines and flush out until chlorine odor is no longer
detected.
Before consumption of water, an EPA Lab
Test is suggested.