background image

10

1.4 Battery Safety Datasheet

1.4.1. Hazard Information

Classification of the hazardous chemical

Exempt from classification according to Australian WHS regulations.

Other hazards

This  product  is  a  Lithium  Iron  Phosphate  Battery  with  certified  compliance  under  the  UN 

Recommendations on Transport of Dangerous Goods, Manual of Tests and Criteria, Part III, subsection 
38.3. For the battery cell, chemical materials are stored in a hermetically sealed metal case, designed 
to withstand temperatures and pressures encountered during normal use. As a result, during normal 
use, there is no physical danger of ignition or explosion and chemical danger of hazardous materials' 

leakage. However, if the product is exposed to afire, added mechanical shocks, decomposed, added 

electric stress by misuse, the gas release vent will be operated. The battery cell case will be breached 

at the extreme. Hazardous materials may be released. Moreover, if heated strongly by the surrounding 
fire, acrid or harmful fume may be emitted.

1.4.2 Safety Datasheet

For detailed information please refer to the provided battery safety datasheet.

1.5 General Precautions

 

DANGER

Danger to life due to high voltages of the PV array, battery and electric shock. When exposed to 
sunlight, the PV array generates dangerous DC voltage which will be present in the DC conductors and 
the live components of the inverter. Touching the DC conductors or the live components can lead to 
lethal electric shocks. If you disconnect the DC connectors from the system under load, an electric arc 
may occur leading to electric shock and burns.

Do not touch uninsulated cable ends.

Do not touch the DC. 

Do not open the inverter and battery.

Do not wipe the system with damp cloth.

Have the system installed and commissioned by qualified people with the appropriate skills only.

Prior to performing any work on the inverter or the battery pack, disconnect the inverter from all 
voltage sources as described in this document.

User Manual

11

 

User Manual

 

WARNING

Risk of chemical burns from electrolyte or toxic gases. During standard operation, no electrolyte shall 
leak from the battery pack and no toxic gases shall form. Despite careful construction, if the Battery 
Pack is damaged or a fault occurs, it is possible that electrolyte may be leaked or toxic gases formed.

Do not install the system in any environment of temperature below -25°C or over 60°C and in 
which humidity is over 95%.

Do not touch the system with wet hands.

Do not put any heavy objects on top of the system. 

Do not damage the system with sharp objects.

Do not install or operate the system in potentially explosive atmospheres or areas of high 
humidity.

Do not mount the inverter and the battery pack in areas containing highly flammable materials 

or gases.

If moisture has penetrated the system (e.g. due to a damaged enclosure), do not install or 
operate the system.

Do not move the system when it is already connected with battery modules. Secure the system 
to prevent tipping with restraining straps in your vehicle.

The transportation of GreenE 8K/10K/12K must be made by the manufacturer or An instructed 
personal. These instructions shall be recorded and repeated.

A certified ABC fire extinguisher with minimum capacity of 2kg must be carried along when 

transporting.

It is totally prohibited to smoke in the vehicle as well as close to the vehicle when loading and 
unloading.

For the exchange of a battery module, please request for new hazardous goods packaging if 
needed, pack it and let it be picked up by the suppliers.

In case of contact with electrolyte, rinse the affected areas immediately with water and consult 
a doctor without delay.

CAUTION

Risk of injury through lifting or dropping the system. The inverter and battery are heavy. There is risk 
of injury if the inverter or battery is lifted incorrectly or dropped during transport or when attaching to 
or removing from the wall.

Lifting and transporting the inverter and battery must be carried out by more than 2 people.

 

Содержание GreenE 10K

Страница 1: ...INSTALLATION OPERATION MAINTENANCE MANUAL GreenE 8K 10K 12K ENERGY STORAGE SYSTEM Master Battery S L Paseo de Extremadura 39 28935 M stoles Madrid Spain Tel 34 918 021 649 Fax 34 917 750 542 info mast...

Страница 2: ...m 3 System Operation 3 1 Switch On 3 2 Switch Off 3 3 Emergency Procedure 4 EMS Introduction and Set Up 4 1 Function Description 4 2 Display and Setting 4 3 Con guration Menus Overview 5 Battery Stora...

Страница 3: ...d in DC coupled systems mostly new installation AC coupled systems mostly retro t and Hybrid coupled systems mostly retro t and PV capacity increase as the following schemes show Figure1 DC coupled St...

Страница 4: ...time use mode customer The customer is able to set up the charging discharging time power via inverter screen or APP 1 2 Operation Modes There are three basic modes that end users can choose via inve...

Страница 5: ...cates that the marked device must not be disposed of as normal household waste It must be disposed of at a collection center for the recycling of electric and electronic equipment 08 1 3 Safety Introd...

Страница 6: ...inverter from all voltage sources as described in this document User Manual 11 User Manual WARNING Risk of chemical burns from electrolyte or toxic gases During standard operation no electrolyte shal...

Страница 7: ...st Check the following parts list to ensure it is complete Delivers a total system separately on site to client this consists of Inverter User Manual 13 Accessory Cable PACK10 2 User Manual Accessory...

Страница 8: ...14 Accessory Cable PACK30 6 User Manual 15 Accessory Cable PACK40 8 User Manual...

Страница 9: ...Floor stand support User Manual 17 1 7 System Appearance Figure 4 GreenE 8K 10K 12K Delivery Scope 1 2 3 4 5 Object Description Hybrid Inverter EMS Display Screen Cable Box connected to Inverter PACK...

Страница 10: ...C A DVC A DVC A DVC A BACKUP DRM OR PARALLEL2 METER DRY BAT BAT CT Note The DVC indicates the minimum required level of protection for the circuit The table values in parentheses are to be used for PC...

Страница 11: ...ance purposes and the system panels must not be blocked User Manual 21 The following locations are not allowed for installation Habitable rooms Ceiling cavities or wall cavities On roofs that are not...

Страница 12: ...objects must be increased The following distances must remain free 600mm beside the GreenE 8K 10K 12K 500mm above the GreenE 8K 10K 12K 600mm before the GreenE 8K 10K 12K If the distance between the G...

Страница 13: ...alled on the backup port of the system according to local regulations Step 4 Remove the debris baf e and secure the battery to the wall with screws and gaskets Step 5 To assemble the second and all ot...

Страница 14: ...make AC cables on site Step 8 1 Please follow the AC cable requirements below For backup connection 12AWG or 4mm2 cable is required to be used For grid connection 10AWG or 6mm2 cable is required to b...

Страница 15: ...and lock it with a screw driver or electric screw driver suggestion stem diameters and torsion of screwdriver or electric screwdriver should be 4mm and 8 12kg f cm respectively 9 Tighten the nut 10 Ci...

Страница 16: ...each other via the respective connectors on the left side After you have connected all the modules together close all covers if you want to connect further battery modules you must mount them before...

Страница 17: ...d in power 1 Loosen the nut and untangle the single aperture sealing ring Step 11 Close the battery covers and connect the PV MC4 connectors to the system connection on both sides Also connect all AC...

Страница 18: ...0 power output Please check installation location of the CT 2 4 DRED Port Connections optional only for DRM function DRED means demand response enable device The AS NZS 4777 2 2015 required inverter n...

Страница 19: ...coupled system Figure 26 AC coupled system User Manual 37 3 System Operation 3 1 Switch On When turning on the system it is very important to follow the steps below to prevent damage to the system WAR...

Страница 20: ...the voltage at the input terminals with a suitably calibrated voltage tester Before working on this equipment please con rm that there is no grid electric supply to the BESS The upper cover plate can...

Страница 21: ...andby Charge Discharge Failure Normal Alarm Protection Dormancy Normal Alarm Normal Alarm Overcharge protection Temperature overcurrent failure protection Normal Alarm Under voltage protection Tempera...

Страница 22: ...the grid will stop charging the battery 00 00 23 59 Charge time Self Consume Peak SHIFT Work Mode SYS Setting Enter Password Default 00000 SET UP Charge from Grid Enable Enable Max SOC 0 100 Disable d...

Страница 23: ...evel 3 Menu Level 4 Menu Level 5 Menu Level 6 Menu Level 7 Menu Level 8 English 9 New Zealand 10 Greece 11 France 12 Bangkok 13 Thailand 14 South Africa 15 50549 16 Brazil 17 0126 18 Ireland 19 Israel...

Страница 24: ...el 6 Independent Disable Charge from Grid Enable Disable default Peak SHIFT Time Setting Charge DISCHG BAT Priority Independent Parallel CV PV input Zero export Set the export power limit Range 0 rate...

Страница 25: ...tery modules Automatic means the system measures the Outside temperature and turns the lm on as needed Only applicable if heating lm is requested at time of ordering Leave disabled The inverter will m...

Страница 26: ...C60 set upper limit voltage set protection time set upper limit voltage set protection time set lower limit voltage set protection time set lower limit voltage set protection time set upper limit fre...

Страница 27: ...lit Allows the user to set the time date and day Clears all stored records 485 Address Baud Rate Language Backlight Date Time Clear REC Menu Level 1 Default Selection Comment Menu Level 2 Menu Level 3...

Страница 28: ...be disposed according to the following requirements Table 5 2 Stored lithium battery recharging interval 1 If a battery is deformed broken or leaking discard it immediately regardless of its storage t...

Страница 29: ...tatus with serve NET light keeps on after the logger powered on 2 Logger running normally READY light Flashes 3 Successful connection status with inverter COM light keeps on Lights Implication Communi...

Страница 30: ...erver cannot be connected Connection between logger and router normal connection between logger and remote server abnormal Slow ash ON Slow ash 1 Check if the router has access to the network 2 Check...

Страница 31: ...xternal packaging or on the logger body User Manual 61 7 4 Network Con guration After the logger is added please con gure the network to ensure normal operation Go to Plant Details Device List nd the...

Страница 32: ...pecial characters in Wi Fi network 5 Shorten the distance between the phone and device 6 Try to connect to other Wi Fi User Manual 63 8 Alarm Code and Error Code 8 1 Alarm Code Codes English descripti...

Страница 33: ...the load and plug in to restart machines then check whether the load is short circuited if the fault has been eliminated 2 Contact customer service if fault remains unremoved 1 Cut off all the power...

Страница 34: ...ot connected 2 Check grid connection 3 Check PV availability 1 Battery is not connected 2 Check if battery wiring port is short circuited 3 Contact customer service if error warning continues 1 Check...

Страница 35: ...ENE 8K 380 850Vd c 16000W 160Ad c 160Ad c 8000W 8000W 16000W 11 6Aa c 12 8Aa c 8800VA 160Ad c 200Ad c 8000W 10000W MODEL PV Terminal Vmax PV Rated Voltage MPPT Voltage Range MPPT Range full load MPPT...

Страница 36: ...Dimension WxHxD mm Weight Kg Relative Humidity Topology Cooling Display Communication Interface Max Conversion Ef ciency From Battery Max Conversion Ef ciency From PV Euro Ef ciency MPPT Ef ciency Pr...

Страница 37: ...0 ohms User Manual 73 11 2 Notes After the equipment is out of operation please pay attention to following notes while maintaining Related safety standards and speci cations should be followed in oper...

Страница 38: ...t or damage is caused by installation repairs modi cation or disassembly performed by a service provider or personnel not from company or his authorized partner The fault or damage is caused by the us...

Отзывы: