2.2 Installation
Step 1
- Remove the battery and inverter from the packaging box.
2.2.1 Battery Installation
Step 2
- Assemble the battery mounting panel on the battery.
Step 3
- Position the battery parallel to the wall and use a
Φ
8mm drill to drill holes at a depth of about
70mm in the wall for subsequent fix action of the mounting plates.
22
If the GreenE 8K/10K/12K is mounted at a wall or at a distance of 300mm from the wall or the
structure separating it from the habitable space, the distances to other structures or objects must be
increased.
The following distances must remain free:
600mm beside the GreenE 8K/10K/12K; 500mm above the GreenE 8K/10K/12K; 600mm before the
GreenE 8K/10K/12K.
If the distance between the GreenE 8K/10K/12K and the ceiling or any object above the system is less
than 500mm, the ceiling or structural surface above the system must be made of noncombustible
material within a radius of 600mm around the system.
The GreenE 8K/10K/12K must be mounted to ensure the highest point is not more than 2.2m above
the ground or the platform.
Figure 8: Limited Distance of Installation to Neighboring Objects
User Manual
23
Figure 9: Assemble Battery Mounting Panel
User Manual
Figure 10: Battery Installation-Drill Holes