38

Step 1

 

- Turn on the battery switch on the battery pack.

Step 2

 

- Press power button on all the batteries until the indicator lights turn on.

Step 3

 

- Turn on the external PV switch.

Step 4

 

- Turn on the external grid switch.

Step 5

 

- If backup load is applied, turn on the external Backup switch.

NOTE:

The Backup switch is only used when a backup load is applied.

Step 6

 

- Open the battery switch cover and turn on the battery switch on the cable box of inverter.

Step 7

 

- Close the battery switch cover and the outer shell of the cable box.

NOTE:

If PV = 0V under sunshine, please check whether PV is connected reversely or whether the 
circuit is normal.

NOTE:

Appliances such as air conditioner are required at least 2-3 minutes to restart because it is 
required to have enough time to balance refrigerant gas inside of circuit. If a power shortage 
occurs and recovers in short time, it will cause damage to your connected appliances. To 
prevent this kind of damage, please check manufacturer of air conditioner if it is equipped with 
time-delay function before installation. Otherwise, this inverter will trigger overload fault and 
cut off output to protect your appliance but sometimes it still causes internal damage to the air 
conditioner.

3.2 Switch O

ff

Step 1

 

- Open cable box outer shell on the inverter, open the battery switch cover and turn off the 

battery switch.

Step 2

 

- Turn off the external grid switch. 

Step 3

 

- If backup load is applied, turn off the external backup switch.

Step 4

 

- Turn off the external PV switch on the cable box. 

Step 5

 

- Open cable box outer shell beside the battery pack, open the battery switch cover and turn 

off the battery switch.

Step 6

 

- Press the power button on all the batteries, till the lights turn off.

Step 7

 

- Close the battery switch cover and the outer shell of cable box.

3.3 Emergency Procedure

When the GreenE 8K/10K/12K energy storage system appears to be running abnormally, you can turn 
off the grid-connected main switch that directly feeding the BESS, and turn off all load switches within

 

User Manual

39

the BESS, turn off the battery switch at the same time. To prevent a potentially fatal personal injury, if 
you want to repair or open the machine after the power is switched off, please measure the voltage at 
the input terminals with a suitably calibrated voltage tester. Before working on this equipment, please 

confirm that there is no grid electric supply to the BESS! The upper cover plate cannot be opened until 

the DC-link capacitance inside the battery modules discharges completely about 15 minutes later.

3.3.1 Emergency Handling Plan

1. Disconnect the AC breaker.

2. Check the control power supply. If it is OK, return the power supply to find out the reason.

3. Please record every detail related to the fault, so Company can analyse and solve the fault. Any 

operation of equipment during a fault is strictly forbidden, please contact Company as soon as 
possible.

4.  As battery cells contain a little Oxygen inside and all cells have got explosion-proof valves, explosion 

hardly happens.

5. When the indicator light on the battery shows a red fault, check the fault type through the 

communication protocol, and contact our after-sales service personnel for advice.

3.3.2 Hazards

If the battery pack leaks electrolyte, avoid contact with the leaking liquid or gas. If one is exposed to 
the leaked substance, immediately perform the actions described below:

Inhalation:

 Evacuate the contaminated area, and seek medical attention. 

Eye contact:

 Rinse eyes with running water for 5 minutes, and seek medical attention.

Contact with skin:

 Wash the affected area thoroughly with soap and water, and seek medical 

attention.

Ingestion:

 Induce vomiting and seek medical attention.

3.3.3 Fire

If a fire breaks out in the place where the battery pack is installed, perform the following countermeasures:

Fire extinguishing media

During normal operation, no respirator is required. Burning batteries can’t be extinguished with a 

regular fire extinguisher, this requires special fire extinguishers such as the Noves 1230, the FM-200 
or a dioxin extinguisher. If the fire is not from a battery, normal ABC fire extinguishers can be used for 

extinguishing.

Fire -fighting instructions

1. If fire occurs when charging batteries, if it is safe to do so, disconnect the battery pack circuit 

breaker to shut off the power to charge.

2. If the battery pack is not on fire yet, extinguish the fire before the battery pack catches fire.
3. If the battery pack is on fire, do not try to extinguish but evacuate people immediately.

There may be a possible explosion when batteries are heated above 150°C. When the battery 
pack is burning, it leaks poisonous gases. Do not approach.

 

User Manual

 

 

Содержание GreenE 10K

Страница 1: ...INSTALLATION OPERATION MAINTENANCE MANUAL GreenE 8K 10K 12K ENERGY STORAGE SYSTEM Master Battery S L Paseo de Extremadura 39 28935 M stoles Madrid Spain Tel 34 918 021 649 Fax 34 917 750 542 info mast...

Страница 2: ...m 3 System Operation 3 1 Switch On 3 2 Switch Off 3 3 Emergency Procedure 4 EMS Introduction and Set Up 4 1 Function Description 4 2 Display and Setting 4 3 Con guration Menus Overview 5 Battery Stora...

Страница 3: ...d in DC coupled systems mostly new installation AC coupled systems mostly retro t and Hybrid coupled systems mostly retro t and PV capacity increase as the following schemes show Figure1 DC coupled St...

Страница 4: ...time use mode customer The customer is able to set up the charging discharging time power via inverter screen or APP 1 2 Operation Modes There are three basic modes that end users can choose via inve...

Страница 5: ...cates that the marked device must not be disposed of as normal household waste It must be disposed of at a collection center for the recycling of electric and electronic equipment 08 1 3 Safety Introd...

Страница 6: ...inverter from all voltage sources as described in this document User Manual 11 User Manual WARNING Risk of chemical burns from electrolyte or toxic gases During standard operation no electrolyte shal...

Страница 7: ...st Check the following parts list to ensure it is complete Delivers a total system separately on site to client this consists of Inverter User Manual 13 Accessory Cable PACK10 2 User Manual Accessory...

Страница 8: ...14 Accessory Cable PACK30 6 User Manual 15 Accessory Cable PACK40 8 User Manual...

Страница 9: ...Floor stand support User Manual 17 1 7 System Appearance Figure 4 GreenE 8K 10K 12K Delivery Scope 1 2 3 4 5 Object Description Hybrid Inverter EMS Display Screen Cable Box connected to Inverter PACK...

Страница 10: ...C A DVC A DVC A DVC A BACKUP DRM OR PARALLEL2 METER DRY BAT BAT CT Note The DVC indicates the minimum required level of protection for the circuit The table values in parentheses are to be used for PC...

Страница 11: ...ance purposes and the system panels must not be blocked User Manual 21 The following locations are not allowed for installation Habitable rooms Ceiling cavities or wall cavities On roofs that are not...

Страница 12: ...objects must be increased The following distances must remain free 600mm beside the GreenE 8K 10K 12K 500mm above the GreenE 8K 10K 12K 600mm before the GreenE 8K 10K 12K If the distance between the G...

Страница 13: ...alled on the backup port of the system according to local regulations Step 4 Remove the debris baf e and secure the battery to the wall with screws and gaskets Step 5 To assemble the second and all ot...

Страница 14: ...make AC cables on site Step 8 1 Please follow the AC cable requirements below For backup connection 12AWG or 4mm2 cable is required to be used For grid connection 10AWG or 6mm2 cable is required to b...

Страница 15: ...and lock it with a screw driver or electric screw driver suggestion stem diameters and torsion of screwdriver or electric screwdriver should be 4mm and 8 12kg f cm respectively 9 Tighten the nut 10 Ci...

Страница 16: ...each other via the respective connectors on the left side After you have connected all the modules together close all covers if you want to connect further battery modules you must mount them before...

Страница 17: ...d in power 1 Loosen the nut and untangle the single aperture sealing ring Step 11 Close the battery covers and connect the PV MC4 connectors to the system connection on both sides Also connect all AC...

Страница 18: ...0 power output Please check installation location of the CT 2 4 DRED Port Connections optional only for DRM function DRED means demand response enable device The AS NZS 4777 2 2015 required inverter n...

Страница 19: ...coupled system Figure 26 AC coupled system User Manual 37 3 System Operation 3 1 Switch On When turning on the system it is very important to follow the steps below to prevent damage to the system WAR...

Страница 20: ...the voltage at the input terminals with a suitably calibrated voltage tester Before working on this equipment please con rm that there is no grid electric supply to the BESS The upper cover plate can...

Страница 21: ...andby Charge Discharge Failure Normal Alarm Protection Dormancy Normal Alarm Normal Alarm Overcharge protection Temperature overcurrent failure protection Normal Alarm Under voltage protection Tempera...

Страница 22: ...the grid will stop charging the battery 00 00 23 59 Charge time Self Consume Peak SHIFT Work Mode SYS Setting Enter Password Default 00000 SET UP Charge from Grid Enable Enable Max SOC 0 100 Disable d...

Страница 23: ...evel 3 Menu Level 4 Menu Level 5 Menu Level 6 Menu Level 7 Menu Level 8 English 9 New Zealand 10 Greece 11 France 12 Bangkok 13 Thailand 14 South Africa 15 50549 16 Brazil 17 0126 18 Ireland 19 Israel...

Страница 24: ...el 6 Independent Disable Charge from Grid Enable Disable default Peak SHIFT Time Setting Charge DISCHG BAT Priority Independent Parallel CV PV input Zero export Set the export power limit Range 0 rate...

Страница 25: ...tery modules Automatic means the system measures the Outside temperature and turns the lm on as needed Only applicable if heating lm is requested at time of ordering Leave disabled The inverter will m...

Страница 26: ...C60 set upper limit voltage set protection time set upper limit voltage set protection time set lower limit voltage set protection time set lower limit voltage set protection time set upper limit fre...

Страница 27: ...lit Allows the user to set the time date and day Clears all stored records 485 Address Baud Rate Language Backlight Date Time Clear REC Menu Level 1 Default Selection Comment Menu Level 2 Menu Level 3...

Страница 28: ...be disposed according to the following requirements Table 5 2 Stored lithium battery recharging interval 1 If a battery is deformed broken or leaking discard it immediately regardless of its storage t...

Страница 29: ...tatus with serve NET light keeps on after the logger powered on 2 Logger running normally READY light Flashes 3 Successful connection status with inverter COM light keeps on Lights Implication Communi...

Страница 30: ...erver cannot be connected Connection between logger and router normal connection between logger and remote server abnormal Slow ash ON Slow ash 1 Check if the router has access to the network 2 Check...

Страница 31: ...xternal packaging or on the logger body User Manual 61 7 4 Network Con guration After the logger is added please con gure the network to ensure normal operation Go to Plant Details Device List nd the...

Страница 32: ...pecial characters in Wi Fi network 5 Shorten the distance between the phone and device 6 Try to connect to other Wi Fi User Manual 63 8 Alarm Code and Error Code 8 1 Alarm Code Codes English descripti...

Страница 33: ...the load and plug in to restart machines then check whether the load is short circuited if the fault has been eliminated 2 Contact customer service if fault remains unremoved 1 Cut off all the power...

Страница 34: ...ot connected 2 Check grid connection 3 Check PV availability 1 Battery is not connected 2 Check if battery wiring port is short circuited 3 Contact customer service if error warning continues 1 Check...

Страница 35: ...ENE 8K 380 850Vd c 16000W 160Ad c 160Ad c 8000W 8000W 16000W 11 6Aa c 12 8Aa c 8800VA 160Ad c 200Ad c 8000W 10000W MODEL PV Terminal Vmax PV Rated Voltage MPPT Voltage Range MPPT Range full load MPPT...

Страница 36: ...Dimension WxHxD mm Weight Kg Relative Humidity Topology Cooling Display Communication Interface Max Conversion Ef ciency From Battery Max Conversion Ef ciency From PV Euro Ef ciency MPPT Ef ciency Pr...

Страница 37: ...0 ohms User Manual 73 11 2 Notes After the equipment is out of operation please pay attention to following notes while maintaining Related safety standards and speci cations should be followed in oper...

Страница 38: ...t or damage is caused by installation repairs modi cation or disassembly performed by a service provider or personnel not from company or his authorized partner The fault or damage is caused by the us...

Отзывы: