1
1.0 SERVICE CONNECTIONS
SERVICE CONNECTIONS
Electrically Operated
Pan Capacity
(
Half Size Pans
)
EC
Electrical Connection - 1-
1/8” (
29mm
) electric
connection to controls.
Size
– Deep
1”
2-
1/2”
4”
6”
GW
Generator Water -
3/8” (
10mm
) OD tubing at 25-50
PSI.
MPS-3E
6
3
2
1
CW
Cold Water -
3/8” (
10mm
) OD tubing at 25-50 PSI.
CAUTION:
Before connecting water to this unit, water supply
should be analyzed to make sure hardness is no
greater than 2.0 grains and pH level is within the
range of 7.0-8.5. Water which fails to meet these
standards should be treated by installation of water
conditioner.
EQUIPMENT FAILURE CAUSED BY
INADEQUATE
WATER
QUALITY
IS
NOT
COVERED UNDER WARRANTY.
D
Drain -
1” (
25mm
) IPS piped to open floor drain.
NO SOLID CONNECTION TO FLOOR DRAIN.
NO BENDS OR ELBOWS.
AMP/PHASE
MODEL
kW
SINGLE PHASE
THREE PHASE
208V
220V
240V
208V
240V
380V
415V
480V
MPS-3E
7.5
36
34
31.3
20.8
18.8
11.4
10.4
9
Содержание MPS-3E
Страница 27: ...24 8 0 PARTS FIGURE 3 Exploded View ...
Страница 33: ...30 9 0 WIRING ...
Страница 34: ...31 9 0 WIRING Continued ...
Страница 35: ...32 9 0 WIRING Continued ...
Страница 36: ...33 9 0 WIRING Continued ...
Страница 37: ...34 9 0 WIRING Continued ...
Страница 38: ...35 9 0 WIRING Continued ...