Installation manual - Ecotype - 21
Using the head of the upper cable, proceed as follows:
•
Insert the steel cable onto all the bows through the hole on the bow support;
•
Last of all, insert the head of the cable into the hole of the first pulling bow;
•
Make sure that there is at least 100-150 mm left of the back end of the cable for
further fastening and possible corrections.
Note:
Ensure that the bow keeps as perpendicular as possible to the board walls for avoiding any subsequent adjustment
service.
Now proceed with positioning the lower end of the steel cable:
HAND OPERATED VERSION for tipper body length < 8 m
1. Pull the lower end onto the rear part of the body.
2. Wrap the steel cable on the rear idler pulley (
4
).
3. Bring the end of the cable back to the pulling bow support.
HAND OPERATED VERSION for tipper body length > 8 m
4. Pull the lower end onto the rear part of the body.
5. Wrap the steel cable on the rear idler pulley or on the pulley of
the rear tensioning plate (
4
).
6. Bring the end of the cable back to the pulling bow support.