
61
3. The General Contractor or Owner must secure
two treated lumber 4" x 4" x 36" (or longer). You
may then mount the remote condenser to the
treated lumber.
4. The General Contractor or Owner must install a 3"
pitch pot in the roof. Then seal for weather
protection.
5. Locate the pre-charged refrigeration lines shipped
with the system. These lines must be a correct
length for the building design. Avoiding any kinks,
neatly route these lines from the remote
condenser to the refrigeration unit. Excess
refrigeration tubing must be handled in one of two
ways. When coiling the excess tubing, make sure
the inlet to the coil is at the top of the coil and the
exit is the bottom of the coil. There can be no
more than one turn to the coil. If you have more
3" Pitch Pot
Roof
STH13_Tech.book Page 61 Wednesday, September 15, 2010 3:20 PM