
39
BASEMENT CONSTRUCTION
Refer to the figure above for the following:
1. Unspool the beer conduit to allow unrestricted
feed during installation process.
2. Route the conduit up basement wall and secure
with appropriate conduit hangers.
3. After routing the conduit up the basement wall,
route conduit overhead on the basement ceiling.
Connect to the basement ceiling using
appropriate conduit hangers.
B
e
ermaster™
Ref
riger
at
ion Unit
W
a
lk-in Cool
er
Dispe
nsing
St
a
ti
o
n
Condu
it Hang
er
B
eer
Cond
uit
STH13_Tech.book Page 39 Wednesday, September 15, 2010 3:20 PM