–78–
Self-Contained Recovery/Evacuation
Place the toggle switch in the OFF position.
Install manifold gauges (with low loss fittings), scale,
and recovery unit or two-stage vacuum pump.
Open (backseat) the high and low side on manifold
gauges.
Perform recovery or evacuation:
A. Recovery: Operate the recovery unit as directed by
the manufacturer’s instructions.
B. Evacuation prior to recharging: Pull the system
down to 500 microns. Then, allow the pump to run
for an additional half hour. Turn off the pump and
perform a standing vacuum leak check.
NOTE:
Check for leaks using a halide or electronic
leak detector after charging the ice machine.
Follow the Charging Procedures on the next page.
Содержание EC18
Страница 2: ......
Страница 6: ...This Page Intentionally Left Blank ...
Страница 12: ...This Page Intentionally Left Blank ...
Страница 14: ... 2 This Page Intentionally Left Blank ...
Страница 24: ...12 Part Number 80 1479 3 10 10 Evaporator Ice Chute Spray Bar Spray Nozzles Toggle Switch ...
Страница 42: ...30 Part Number 80 1479 3 10 10 This Page Intentionally Left Blank ...
Страница 74: ...62 Part Number 80 1479 3 10 10 This Page Intentionally Left Blank ...
Страница 75: ...Part Number 80 1479 3 10 10 63 ...
Страница 100: ... 87 This Page Intentionally Left Blank ...
Страница 101: ... 88 This Page Intentionally Left Blank ...
Страница 175: ... 162 This Page Intentionally Left Blank ...
Страница 181: ... 168 ...
Страница 182: ......
Страница 183: ......