
–22–
CONNECT THE LINE SET TO THE CVD
®
CONDENSING UNIT
The compressor oil rapidly absorbs moisture.
Be
prepared
to complete line set installation and start
your evacuation process in order to minimize the time
the compressor is exposed to the atmosphere.
(Maximum amount of time the system can be exposed
to the atmosphere is 15 minutes.)
The line set can be routed for entry through the front or
left side of the condensing unit.
Remove knockout for preferred location.
Insert supplied plastic bushings in knockout holes to
prevent tubing from contacting sheet metal.
Use the supplied 90° elbows to route tubing.
Cut the tubing ends of the suction and liquid lines
and braze line sets to the condensing unit.
!
Warning
The condensing unit ships from the factory
pressurized with a 50/50 mixture of nitrogen/helium.
Bleed off pressure from both suction and liquid line
access ports prior to cutting into refrigeration lines.
PT1284A
MINIMIZE THE TIME THE REFRIGERATION
SYSTEM IS EXPOSED TO THE ATMOSPHERE
(15 MINUTES MAXIMUM).
SUCTION
FILTER
SUCTION LINE
Содержание CVD0675
Страница 2: ......
Страница 75: ... 69 QDUAL DISTRIBUTION TUBE SV1780 EVAPORATOR WATER PUMP WATER CURTAIN WATER TROUGH ...
Страница 153: ... 149 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 203: ......