![Manitowoc 2250 MAX-ER 2000 Скачать руководство пользователя страница 95](http://html.mh-extra.com/html/manitowoc/2250-max-er-2000/2250-max-er-2000_operators-manual_701156095.webp)
Reference
Only
Manitowoc
Published 01-08-13, Control # 049-05
4-15
2250 MAX-ER 2000 OPERATOR’S MANUAL
SET-UP AND INSTALLATION
4
Raise Mast
General
A holdback is required to raise the mast. One of two methods
can be used:
•
Assist crane to which the boom hoist equalizer is
securely attached (Figure 4-6, View D). The assist crane
must be capable of providing horizontal and vertical
holdback forces listed in the table in Figure 4-6.
Assist crane can tip if it is too small or improperly
positioned.
•
Fully rigged boom 120 ft (36,6 m) minimum.
If desired, the MAX-ER mast can be used as a boom to
assemble and install the MAX-ER boom. If the mast will be
used as a boom, see Mast Capacities for Self-Assembly and
Disassembly for instructions.
The following procedure contains steps for raising the mast
using the boom as a holdback. The same procedure applies
if an assist crane is used as the holdback with the following
exceptions:
•
Securely attach boom hoist equalizer to proper size
assist crane.
•
Park assist crane approximately 15 ft (4,6 m) from
equalizer.
•
Install boom after mast is fully raised.
.
The SETUP mode must be selected and confirmed (MAX-
ER mode turned off) in order to raise the mast. In this mode,
the 80° mast stop limit is automatically bypassed. The
following controls are used to raise the mast:
•
Drum 2 (boom hoist).
•
Drum 4 (mast hoist).
•
Drum 2 and Drum 4 park and pawl switches.
A qualified operator is required to raise the mast. The
operator must be experienced with the 2250 liftcrane MAX-
ER 2000 attachment and thoroughly familiar with their
operation. S ee the Operating Controls in the Crane
Operator’s Manual for identification and operation of the
controls.
A qualified signal person is required to give signals to the
operator.
Connect Hydraulic Hoses
See Figure 4-6 for following procedure.
1.
Make sure accumulator is stamped for 2,000 psi (138
bar) pre-charge.
FIGURE 4-6 continued
View D
L
Boom Hoist
Equalizer
Assist Crane (or
other holdback)
Dimension L
Horizontal
Vertical
ft
m
lb
kN
lb
kN
120
36,6
13,450
60
10,940
49
150
45,7
13,450
60
9,230
41
200
61,0
13,450
60
7,320
33
250
76,2
13,450
60
6,070
27
NOTE:
Holdback forces are with equalizer attached
to holdback 3 ft (0,9 m) above ground.
CAUTION
Wire Rope/Sheave Damage!
Do not allow boom hoist equalizer to drag across ground
while raising mast with assist crane as holdback. Keep
equalizer level.
Содержание 2250 MAX-ER 2000
Страница 1: ...R e f e r e n c e O n l y MAX ER 2000 Operator Manual Manitowoc 2250 ...
Страница 2: ...R e f e r e n c e O n l y ...
Страница 4: ...R e f e r e n c e O n l y ...
Страница 56: ...R e f e r e n c e O n l y 2250 MAX ER 2000 OPERATOR S MANUAL 3 ii Published 01 08 13 Control 049 05 ...
Страница 195: ...R e f e r e n c e O n l y ...
Страница 196: ...R e f e r e n c e O n l y ...