2250 MAX-ER 2000 OPERATOR’S MANUAL
SET-UP AND INSTALLATION
4
Remove MAX-ER Counterweight
1.
Disconnect counterweight straps from strap cylinders on
trailer.
To perform this step, select and confirm STANDARD
mode. Then use counterweight switch on MAX-ER
remote control to extend strap cylinders so connecting
pins are loose.
Fully retract strap cylinders when complete.
2.
Remove counterweight boxes. See Counterweight
Installation for identification of the boxes.
a.
Remove center counterweight boxes.
b.
Remove right and left side boxes and adapter
plates.
3.
Lower strap assist cylinders (Figure 4-12, View A):
a.
Hook assist crane to hole in cylinder rod end.
b.
Remove locking pin holding cylinder in position.
c.
Lower cylinder assembly to horizontal stored
position.
Disconnect Trailer from Crane
1.
Make sure trailer pins are in proper position for
Trailer ATTACHED to Crane (Figure 4-9).
2.
If trailer is being shipped or will be stored on tires,
proceed as follows:
a.
Extend jacks until tires are clear of ground or most
of bulge is out of tires.
b.
Rotate wheels to
CRAB
position.
See Operation Guide in Section 2 for instructions.
3.
If trailer will be supported on tires, block under trailer
arm inserts so trailer cannot tip over.
4.
If trailer will be supported on jacks, extend jacks until
trailer is level and most of bulge is out of tires.
WARNING
Tipping Hazard!
Alternate removal of counterweight boxes from front to
rear and from side to side to prevent unbalanced loading
of trailer.
DANGER
Trailer Tipping Hazard!
•
Support trailer on a firm level uniformly supporting
surface in either of following positions when it is
disconnected from crane:
-
Extend jacks to level trailer and install wedges.
This position must be used if counterweights
and arm inserts are installed.
-
Rotate wheels to CRAB position, install wedges,
and block tires so trailer cannot roll. This is
shipping position and can be used only on
job site when counterweights are removed. If
arms are installed, wheels must be blocked.
•
Install wedges whenever trailer is disconnected from
crane — whether supported on jacks or on tires.
•
Install pins in proper position prior to jacking or
performing other procedures. See Figure 4-9 for
correct pin and wedge positions.
•
Make sure jacking surface supports weight of trailer
and counterweight and provides necessary traction to
prevent jacks from sliding under load.
•
Operate jacks slowly and smoothly so trailer remains
as level as possible while jacking.
WARNING
Trailer Tipping Hazard!
When trailer is supported on jacks, install front jack pins
(C, Figure 4-9, View C) in holes (5) before removing pins
connecting trailer arm adapter from crane.
Содержание 2250 MAX-ER 2000
Страница 1: ...R e f e r e n c e O n l y MAX ER 2000 Operator Manual Manitowoc 2250 ...
Страница 2: ...R e f e r e n c e O n l y ...
Страница 4: ...R e f e r e n c e O n l y ...
Страница 56: ...R e f e r e n c e O n l y 2250 MAX ER 2000 OPERATOR S MANUAL 3 ii Published 01 08 13 Control 049 05 ...
Страница 195: ...R e f e r e n c e O n l y ...
Страница 196: ...R e f e r e n c e O n l y ...