2250 MAX-ER 2000 OPERATOR’S MANUAL
SET-UP AND INSTALLATION
4
Install Straps
See Figure 4-4 for following procedure.
1.
Remove and set to side straps shipped on 10 ft (3,1 m)
and 40 ft (12,2 m) inserts.
NOTE:
Straps stored on mast top are equipped with lifting
lugs.
Lugs on straps (right-hand and left-hand) must face
inside of mast.
2.
Install strap rests assemblies (8, View E) on 40 ft
(12,2 m) insert at dimensions shown in View A (2 places
each side).
3.
Remove strap storage bars from mast top (four places).
4.
Lift straps (3) stored on mast top and lay into side mast
rests on 10 ft and 40 ft inserts (four places) (View A).
5.
Securely attach taglines (fiber rope) approximately 75 ft
(23 m) long to links at lower end of both counterweight
straps (5).
Raise Gantry
See Figure 4-4 for following procedure.
1.
Rotate mast strap brackets on gantry from stored
position to working position and pin to gantry (View C).
2.
Hook slings from assist crane to connecting holes in end
of mast hoist equalizer.
3.
Start 2250 engine. Select set-up mode and confirm.
4.
Slowly pay out 2250 mast hoist wire rope (Drum 4) and
carefully lift equalizer clear of tie-down clips on gantry
(View B) (must guide equalizer forward slightly).
5.
Continue until equalizer is pulled about 1 ft (0,3 m) out of
clips. Equalizer must remain clear of gantry guide
rollers.
6.
Haul in assist crane load line to lift equalizer off gantry.
Pay out 2250 mast hoist wire rope at same time.
7.
Maintain equal haul in and pay out speeds so equalizer
rises smoothly to approximately 20 – 25 ft (6 – 7,6 m)
(View D). Park mast hoist (drum 4).
8.
Slowly haul in assist crane load line to raise gantry.
Pins will engage automatically when gantry is in
intermediate position (View D).
Place Mast Hoist Equalizer on Mast Butt
See Figure 4-4 for following procedure.
1.
Travel and swing assist crane as needed to pull
equalizer toward mast butt. Pay out 2250 mast hoist wire
rope at same time (View D).
2.
Maintain equal haul in and pay out speeds so equalizer
moves smoothly toward mast butt.
3.
Pay out load line to lower equalizer onto rails on mast
butt (View F). Haul in 2250 mast hoist wire rope as
needed.
Содержание 2250 MAX-ER 2000
Страница 1: ...R e f e r e n c e O n l y MAX ER 2000 Operator Manual Manitowoc 2250 ...
Страница 2: ...R e f e r e n c e O n l y ...
Страница 4: ...R e f e r e n c e O n l y ...
Страница 56: ...R e f e r e n c e O n l y 2250 MAX ER 2000 OPERATOR S MANUAL 3 ii Published 01 08 13 Control 049 05 ...
Страница 195: ...R e f e r e n c e O n l y ...
Страница 196: ...R e f e r e n c e O n l y ...