64
≥
100
>100
≥
125
≥
125
≥ 50
≥
100
Dimensions
Number
ZB1
Number
ZH1
A,B ≤ 400
1
1
400 <
A,B ≤ 800
2
2
800 <
B ≤ 1200
3
3
1200 <
B ≤ 1500
4
4
* min. 110 - Concrete/ min. 125 - Aerated concrete
Position:
1
Fire damper with installation frame E1
2
Holder with screws
3
Gypsum plate
4
Stuffing box (mineral stone wool min. density 140 kg/m³)
5
Fire protection mastic min. thickness 1 mm
*
Installation frame E1 is suitable for:
●
Solid wall construction
●
Gypsum wall construction
●
Solid ceiling construction
On the inside and outside is installation frame equipped by intumescent sealing. It enlarges its capacity
and air proofs the gap between damper body and installation frame and between installation frame and
wall construction.
●
Gypsum wall construction has to be installed according manufacture requirements.
●
Installation frame:
cement lime plates
●
Fasteners:
galvanized plate
●
a x b = (A + 105
+3
mm) x (B + 105
+3
mm)
It is possible to use
corresponding number
of holes and screws
Gap between frame and thin shaft wall construction must be filled by glue (PROMAT K84).
Dampers has to be suspended in an appropriate manner see chapter 9.
Installation opening has to
be reinforced by steel U-
profile. Profile is fixed by
screws ≥3,5 mm with corre-
sponding length. Distance
between screws ≤200 mm.
Содержание FDMQ
Страница 1: ......
Страница 34: ...34 100 100 100 Position 1 Fire damper 2 Installation frame 3 Solid wall construction...