6
M2 ASSEMBLY GUIDE
The first step to starting your M2 CNC adventure is to build the frame that will hold your
material and the M2 while it cuts. The M2 mounts for your frame are included, but you will
need to purchase the following from a local hardware store:
Item
Standard Sized Bricks
2”x4”x8’
2”x4”x10’ Board
1”x6”x8’ Board
4’x8’x3/4” Plywood or MDF
Quantity
2
1
1
2
1
Top Beam: 2"X4"10'
2x Leg: 2"X4"X4'
Footer: 1"X6"X8'
Support: 1"X6"X8' Cut to 93"
Waste Board: 4'X8' Plywood
314.8 [12.4in]
32 [1.3in]
19.45 [.8in]
19.45 [.8in]
8X
1
8
" Pilot Holes
Top Beam: 2"X4"10'
2x Leg: 2"X4"X4'
Footer: 1"X6"X8'
Support: 1"X6"X8' Cut to 93"
Waste Board: 4'X8' Plywood
314.8 [12.4in]
32 [1.3in]
19.45 [.8in]
19.45 [.8in]
8X
1
8
" Pilot Holes
PURCHASE
LIST
Name
Bricks for sled weight
For Legs
Top Beam
Footer, Support Piece
Wasteboard
2”x4”x4’ Board
1”x6”x7’ 3/4” Board
2
1
Legs
Support Piece
CUT
LIST
We recommend reading this entire section before beginning.
Top Beam: 2"X4"10'
2x Leg: 2"X4"X4'
Footer: 1"X6"X8'
Support: 1"X6"X8' Cut to 93"
Waste Board: 4'X8' Plywood
314.8mm [12.4in]
32mm [1.3in]
19.45mm [.8in]
19.45mm [.8in]
8X
1
8
" Pilot Holes
1. PURCHASE LIST
This work is licensed under the creative commons Attribution
NonCommercial-NoDerivatives 4.0 International license.
Last Updated 8.12.2020
Version 1.8