MAJORSINE Inverter Manual / M101.4
Page 17
5. OPERATION
5-1 Connecting the Input Power
¾
Once the DC power has been connected, engage the DC
breaker to operate the inverter.
¾
Turn ON the AC bypass supply. Typically a circuit breaker in
the service panel.
¾
Verify operation start-up sequence of the inverter and make
settings changes as needed for the application.
(See 5.3 or 5.3a – Front Panel Operation)
5-2 Connecting the Loads
¾
Calculate the total power consumption (VA) of the load being
attached to the output. Make sure that the total power
consumption does not exceed the rated load of the inverter.
¾
The load consumption can be monitored on the front screen of
the inverter using the data button.
¾
Should the total load exceed the capacity of the inverter,
remove uncritical loads until the total load is within the capacity
of the inverter. Distribute removed loads to alternate sources
or additional inverters
¾
Only two hardwire adapters will fit on the integrated NEMA
duplex outlets of the inverter. Loads should be distributed so
not to exceed current ratings of hardware and cable.