Starting up for the first time
49
110
0
Starting up for the first time
After bringing in the Furnace, connecting up the hydronics and power supply, the unit can be started up for
the first time.
A
Aiirr ttiig
gh
htt p
prro
op
pe
errtty
y o
off c
co
om
mb
bu
ussttiio
on
n c
ch
ha
am
mb
be
err
To ensure correct combustion and overall operation, all
fittings to the combustion chamber must be correctly
assembled to be completely air-tight.
Note:
The Furnace may only be commissioned (first start-up) by an authorized installer.
Before starting up the pellet Furnace, the following settings must be made in the sequence specified below:
1.
Adjust power rating
2. Settings in the Furnace control unit
3. Output test - test all motors
4. Start the pellet Furnace
Use the checklist enclosed to document the start-up procedure.
P
Prro
op
pe
errtty
y d
da
am
ma
ag
ge
e
The allowable limits of temperature for the controller on
the furnace are 40° F to 122° F. It is therefore necessary
that the furnace room be no hotter than 90° F to avoid
damage to the controller!
Installation Manual AutoPellet Air Furnace 17 — 28
Содержание AutoPellet Air TOUCH 17
Страница 42: ...42 Cable routing PE 603 USA_FA 1 0...
Страница 43: ...Cable routing 43 Installation Manual AutoPellet Air Furnace 17 28...
Страница 45: ...Wiring diagrams 45 Installation Manual AutoPellet Air Furnace 17 28...
Страница 46: ...46 Wiring diagrams PE 603 USA_FA 1 0...
Страница 47: ...Wiring diagrams 47 Installation Manual AutoPellet Air Furnace 17 28...
Страница 70: ...70 Pellet Furnace cautionary markings PE 603 USA_FA 1 0...
Страница 71: ...Pellet Furnace cautionary markings 71 Installation Manual AutoPellet Air Furnace 17 28...
Страница 72: ...72 Pellet Furnace cautionary markings Labeling 105x74 PE 603 USA_FA 1 0...
Страница 73: ...Pellet Furnace cautionary markings 73 Installation Manual AutoPellet Air Furnace 17 28...
Страница 74: ......
Страница 75: ......