36
Installing the de-ashing system
8.2 Installing the de-ashing system
We recommend installing the de-ashing system after the Furnace has been brought in, but before the Furna-
ce casing is fitted. The de-ashing system has to be installed before the burner casing is assembled.
Installation of the de-ashing system is divided into the following steps:
1.
Bringing in and installing the de–ashing system on the base plate
2. Installing the de-ashing auger, fitting the sub-assembly and mounting the door plate
3. Installing the burner side casing with cut-out and electrical connection
4. Assembling the pellet Furnace and activating the ash box
8
8..2
2..11 B
Brriin
ng
giin
ng
g iin
n a
an
nd
d iin
nsstta
alllliin
ng
g d
de
e––a
assh
hiin
ng
g ssy
ysstte
em
m o
on
n tth
he
e b
ba
asse
e p
plla
atte
e
Note:
5: Replace the screw with the base in a horizontal position.
PE 603 USA_FA 1.0
Содержание AutoPellet Air TOUCH 17
Страница 42: ...42 Cable routing PE 603 USA_FA 1 0...
Страница 43: ...Cable routing 43 Installation Manual AutoPellet Air Furnace 17 28...
Страница 45: ...Wiring diagrams 45 Installation Manual AutoPellet Air Furnace 17 28...
Страница 46: ...46 Wiring diagrams PE 603 USA_FA 1 0...
Страница 47: ...Wiring diagrams 47 Installation Manual AutoPellet Air Furnace 17 28...
Страница 70: ...70 Pellet Furnace cautionary markings PE 603 USA_FA 1 0...
Страница 71: ...Pellet Furnace cautionary markings 71 Installation Manual AutoPellet Air Furnace 17 28...
Страница 72: ...72 Pellet Furnace cautionary markings Labeling 105x74 PE 603 USA_FA 1 0...
Страница 73: ...Pellet Furnace cautionary markings 73 Installation Manual AutoPellet Air Furnace 17 28...
Страница 74: ......
Страница 75: ......