9.2 Cable routing
Reroute cables after dismantling the casing or other system components.
R
Riissk
k o
off e
elle
ec
cttrriic
c ssh
ho
oc
ck
k
Switch off the system before performing work on the
Furnace.
Note the following points to ensure the cables are routed securely:
Cables must not be routed:
• over moving parts
• over hot parts
• over sharp edges
Cables must be:
• routed in the cable ducts provided
• through cable leadthroughs
• tied together
• secured with cable ties at the points provided
• Power cables must be routed in the right-hand duct and sensor cables must be routed in the left-hand
duct.
R
Riissk
k o
off e
elle
ec
cttrriic
c ssh
ho
oc
ck
k
Check cables for damage..
Replace any cables that are damaged.
D
Da
am
ma
ag
ge
e tto
o tth
he
e F
Fu
urrn
na
ac
ce
e c
co
on
nttrro
olllle
err
Before fitting the casing components, make sure that all
cables are connected to the correct points on the con-
troller! Failure to do so can lead to damage to the con-
troller, and such damage is not covered by warranty!
Installation Manual AutoPellet Air Furnace 17 — 28
Содержание AutoPellet Air TOUCH 17
Страница 42: ...42 Cable routing PE 603 USA_FA 1 0...
Страница 43: ...Cable routing 43 Installation Manual AutoPellet Air Furnace 17 28...
Страница 45: ...Wiring diagrams 45 Installation Manual AutoPellet Air Furnace 17 28...
Страница 46: ...46 Wiring diagrams PE 603 USA_FA 1 0...
Страница 47: ...Wiring diagrams 47 Installation Manual AutoPellet Air Furnace 17 28...
Страница 70: ...70 Pellet Furnace cautionary markings PE 603 USA_FA 1 0...
Страница 71: ...Pellet Furnace cautionary markings 71 Installation Manual AutoPellet Air Furnace 17 28...
Страница 72: ...72 Pellet Furnace cautionary markings Labeling 105x74 PE 603 USA_FA 1 0...
Страница 73: ...Pellet Furnace cautionary markings 73 Installation Manual AutoPellet Air Furnace 17 28...
Страница 74: ......
Страница 75: ......