Fig. 27a
page 34
6. Ensure the inner flue support bracket is positioned in the flue (
7. Engage the flue into the flue elbow using soap solution to ease the engagement ensuring the flue is assembled as shown (
).
Rear flue only:- Take the tape supplied in the kit and wrap around the joint between the flue and the elbow (
8. Place the gasket over the flue exit on the boiler.
9. Slide the flue assembly through the hole in the wall.
10. Engage the elbow on to the flue connection on top of the boiler. Secure with the four screws supplied in the kit.
11. Make good between the wall and air duct outside the building ensuring the 1.5° drop between the terminal and elbow.
12. The flue trim should be fitted once the installation is complete and the flue secure (
). Apply a suitable mastic to the inside of the trim and press
against the wall finish, making sure the brickwork is dust free and dry.
13. If necessary fit a terminal guard (see
).
VERTICAL FLUEING
1. Only use a flue approved with the Main Heat range.
Fig. 28
Содержание Main Heat 12
Страница 8: ...Fig 3 Fig 4 Fig 5 Fig 6...
Страница 38: ...Example 1 Example 2 Example 3...
Страница 40: ...Fig E Fig F...
Страница 51: ...Fig 31 Fig 32 Fig 33...
Страница 55: ...Fig 35 Fig 36 page 39 12 2 Checking the Combustion 1 Follow the flow chart opposite...
Страница 56: ......
Страница 63: ...Fig 45 Fig 46...
Страница 66: ......
Страница 69: ...Fig 55 Fig 56 Fig 57 Fig 58...
Страница 72: ...page 52...
Страница 74: ...page 54...
Страница 75: ...DRY FIRE...
Страница 76: ...page 55 IGNITION LOCKOUT...
Страница 77: ...page 56 OVERHEAT LOCKOUT...
Страница 78: ...page 57 FAN LOCKOUT NOTE The fan is supplied with 325 Vdc...
Страница 80: ...warranty This does not affect the customer s statutory rights page 62...
Страница 82: ...page 63...