Table of contents
2
Table of contents
Overview of ER GH AP/APB system ...
Scope of delivery ..................................
Intended use..........................................
General safety instructions .................
System and product information ........
Certificates of approval..............
Installation conditions ................
Permitted exhaust air systems ..
Possible combinations...............
Covers: Functions......................
Technical data .......................................
Environmental conditions and
operating limits ..........................
Regulations for operation with
fireplaces ...................................
Technical data table ..................
Storage ......................................
Mounting preparations .........................
Requirements in line with ap-
proval.........................................
Permissible installation posi-
tions for AP and APB fans .........
Preparations for ER-APB
wall installation (with fire
protection) ......................
Preparations for the ER-
APB ceiling installation
(with fire protection)........
ER-AP: Preparations for wall,
shaft or ceiling installation
without fire protection ................
Preparations for the electrical
connection .................................
Preparations for wall installation
Preparation for ceiling installa-
tion (with fire protection) ............
ER-APB shut-off device, ER-AP
shutter........................................
Safety instructions for
the installation of the
plastic shutter..................
Preparing the shutter.................. 17
Attaching blind plug .................... 17
Conversion of air blow-out ad-
apter for using the AP housing ...
Housing installation .............................. 18
Installation of ER GH housing .... 18
Mounting information.................. 18
10 Electrical connection ............................ 18
Electrically connecting the unit ... 19
11 Final mounting ....................................... 20
Attaching fan insert..................... 20
Attaching cover ER-A, ER-AK,
ER-AH or ER-AB ........................
Key lock ...................................... 21
12 Operating the unit.................................. 21
13 Spare parts ............................................. 21
14 System and accessory components ... 21
System components................... 21
15 Removal.................................................. 22
16 Environmentally responsible dis-
posal .......................................................
Содержание ER GH AP
Страница 24: ...17 Wiring diagram 24 Motor control...
Страница 25: ...Notes...
Страница 26: ......
Страница 27: ......