17 Wiring diagram
23
Dispose of the
packaging material
in an environ-
mentally-friendly way, in compliance with the reg-
ulations valid in the country where you are.
Dispose of the
air filter
in an environmentally-
friendly way, in compliance with the regulations
valid in the country where you are.
At the end of its service life, dispose of the
unit
in
an environmentally-friendly way, in compliance
with the regulations valid in the country where you
are.
17 Wiring diagram
Wiring diagrams
Tolerances for the stated times = nominal
value ± 5 %
Values that can be set with optional cover with in-
tegrated electronics:
• ER-AK, ER-AH, ER-AB: Start delay and over-
run time
• ER-AH: Humidity control
• ER-AH: Motion detector
For ER-A cover:
• Start delay of 60 seconds
• Overrun time of 15 minutes.
Connection variants, base load/full load for
ER-A, ER-AK, ER-AH and ER-AB
Nominal load can be
switched
Nominal load can be
switched with permanent
base load
Base and nominal load
can be switched
Motor control
Motor control
Motor control
(standard)
(standard)
(standard)
(optional)
(optional)
(optional)
Connection variants interval, humidity, move-
ment for ER-AK, ER-AH, ER-AB
‒ Not for ER-A ‒
Содержание ER GH AP
Страница 24: ...17 Wiring diagram 24 Motor control...
Страница 25: ...Notes...
Страница 26: ......
Страница 27: ......