background image

8 Mounting preparations

13

 DANGER Danger to life due to fire trans-

mission if not flush with the brickwork or with
panel building materials.

If used outside the shaft, seal the gap remaining
between the connection duct and brickwork/wall
boards with non-flammable materials resistant to
deformation.
For example, use concrete or cement mortar for
brickwork or special fire protection filler for wall
boards.

Procedure

It is essential to observe the installation in-
structions: 
Mounting preparations [

}

 9]

.

1. Correctly attach main duct inside the shaft.

2. Apply ceiling compound. To do this, encase

the ceiling and pour in the material from
above.

3. Make shaft opening for the DN 80 steel folded

spiral-seams duct.

4. Fit duct attachments to the ceiling. Only use

permitted, suitable mounting material.

5. Connect DN 80 steel folded spiral-seams duct

to main duct and seal for ventilation, for ex-
ample with cold-shrink tape.

6. Apply brickwork compound. Seal gap between

brickwork and folded spiral-seams duct. The
gap remaining must be fully sealed with non-
flammable materials that are resistant to de-
formation. For example, use concrete or ce-
ment mortar or for wall boards, use fire protec-
tion filler.

7. Fasten duct bends with 3 steel screws or 3

steel blind rivets.

8. Make the DN 80 opening for the unit connec-

tion socket in the suspended ceiling (fire res-
istance is not required). It is essential to ob-
serve the permissible installation positions:

Permissible installation positions for AP and
APB fans [

}

 10]

.

9. Attach the suspended ceiling and provide a

suitable, level substructure.

It is imperative to compensate any uneven-
ness in the wall or ceiling so that the lower
part of the housing can be installed without
warping. Otherwise it may be that the fan
insert can no longer be inserted into the
lower part of the housing or that the de-
gree of protection indicated on the rating
plate is no longer guaranteed.

10.Attach spigot made from shaft material F90

around the shaft.

The spigot compensates for the length of
the shaft walls in the event of a fire.

11.Continue with the safety-related test of the

shut-off device: 

Electrically connecting the unit

[

}

 19]

.

8.4 ER-AP: Preparations for wall,
shaft or ceiling installation without
fire protection

1. Carry out installation preparations as de-

scribed: 

Requirements in line with approval

[

}

 10]

. However, comply with the specifications

suitable for the exhaust air system in accord-
ance with the applicable fire protection regula-
tions.

2. Permissible connection ducts for connection

without fire protection requirements:

• Shaft/wall installation: Flexible aluminium duct

with DN 80 connection diameter, max. 2 m
long, two 90° elbows

• Ceiling installation (connection outside of the

shaft): Steel folded spiral-seams duct and/or
flexible aluminium duct with DN 80 connection
diameter, max. 2 m long, two 90° elbows.

3. Use suitable mounting material for installation

without fire protection.

8.5 Preparations for the electrical
connection

 DANGER Danger to life from electric

shock.

Before laying the power cable, switch off all sup-
ply circuits. Switch off mains fuse, secure against
being accidentally switched back on and position
a visible warning sign.

Содержание ER GH AP

Страница 1: ...Installation and operating instructions Surface mounted exhaust air system for single duct air ex traction according to DIN 18017 3 ER GH AP ER GH APB www maico ventilatoren com...

Страница 2: ...or the ER APB ceiling installation with fire protection 11 8 4 ER AP Preparations for wall shaft or ceiling installation without fire protection 13 8 5 Preparations for the electrical connection 13 8...

Страница 3: ...ng 1 Overview of ER GH AP APB system 1 Central screw 2 G2 air filter 3 Covers 3 1 ER A cover 3 2 ER AB cover ER AK and ER AH not shown 4 ER EC fan insert 5 Air blow out ad apter 6 ER GH AP ER GH APB h...

Страница 4: ...s retire ment homes or hotel complexes Installation in a ventilation shaft in the wall front wall or a suspended ceiling is permissible The fans are only intended for domestic use and similar purposes...

Страница 5: ...ff all supply circuits switch of mains fuse and secure it against being accidentally switched back on again Attach a warning sign in a clearly visible place Be sure to observe the relevant regulations...

Страница 6: ...hanges and modifications to the units are not permitted and release the manufacturer from any guarantee obligations and liability e g if the housing is drilled at a point which is not permitted CAUTIO...

Страница 7: ...enter ER APB Fire protection model with mainten ance free fire protection shut off device K 90 18017 metal backflow preventer with soldered strut Exhaust socket locked in housing Electrical connection...

Страница 8: ...20 m h 30 m h 40 m h or 100 m h Full load level on off via light switch or separate switch During manual operation e g using light switch the start delay and overrun time apply Full load operation 60...

Страница 9: ...iteria drawn up by the respons ible regional master chimney sweep are met Parallel operation of air ventilated fireplaces for liquid or gaseous fuels and air extracting equip ment can be prevented usi...

Страница 10: ...x 2 m long approval Duct elbows in the unit connection duct Max 90 bend ascending Number of duct el bows permitted for wall installation Max 1 x 90 Max 2 x 90 Number of duct el bows permitted for ceil...

Страница 11: ...the flexible aluminium duct to the main duct and seal for ventilation 4 Cut flexible aluminium duct to length observe a maximum duct length of 2 m Dimension the length of the flexible alu minium duct...

Страница 12: ...ween the duct fastenings It is essential to observe the installation instructions Mounting prepara tions 9 Duct attachment with duct clamp alternatively duct attachment with clamping band Danger due t...

Страница 13: ...APB fans 10 9 Attach the suspended ceiling and provide a suitable level substructure It is imperative to compensate any uneven ness in the wall or ceiling so that the lower part of the housing can be...

Страница 14: ...ation 1 1 Dowel for drill holes Mounting information Always use correct duct material for the AP housing For fire protection systems the gap remaining between the connection duct and brickwork wall bo...

Страница 15: ...ch main duct inside the shaft 3 For fire protection systems use ceiling com pound To do this encase the ceiling and pour in the material from above 4 Connect connection duct suitable for the housing t...

Страница 16: ...of the fire protection shut off device It is essential to observe the permissible installa tion positions Permissible installation positions for AP and APB fans 10 DANGER Danger to life due to fire t...

Страница 17: ...uct The gap remaining must be fully sealed with non flammable materials that are resist ant to deformation For example use concrete or cement mortar or for wall boards use fire protection filler 8 Fit...

Страница 18: ...housing without fire protection device Installation is permissible in the following posi tions Wall installation With air outlet direction ex haust socket to the rear Mounting directly on the wall Mo...

Страница 19: ...ted duct cross section of max 1 5 mm Only connect the unit to a permanent electrical installation The degree of protection is only guaranteed for intended installation if the power cable is properly i...

Страница 20: ...n For installation conditions and detailed informa tion on the final assembly of the fan insert and cover Observe Instructions for ER covers 11 1 Attaching fan insert 1 Plug the fan insert directly in...

Страница 21: ...ply air during opera tion If the unit is switched on and off manually function is not always ensured in accordance with DIN 18017 3 13 Spare parts Spare parts may only be sourced from and fitted by a...

Страница 22: ...cement air filters for ER A Article no 0093 0611 100x ZF EC replacement air filters filter class G2 100x filter change indicator TimeStrip ZF EC replacement air filter for ER AK ER AH and ER AB Articl...

Страница 23: ...Wiring diagrams Tolerances for the stated times nominal value 5 Values that can be set with optional cover with in tegrated electronics ER AK ER AH ER AB Start delay and over run time ER AH Humidity c...

Страница 24: ...17 Wiring diagram 24 Motor control...

Страница 25: ...Notes...

Страница 26: ......

Страница 27: ......

Страница 28: ...Maico Elektroapparate Fabrik GmbH Steinbeisstr 20 78056 Villingen Schwenningen Deutschland Service 49 7720 6940 info maico de D10 20_EN_DSW AS AV...

Отзывы: