16
4.4 Feeding table extension plate
installation
In below photo, there are 3 screws circled in red. Those are for install the
extension plate on the feeding table. Please make sure the screws are tight.
4.5 Paper deflector and Paper guide-
pillar
As the following photo, the pillar paper guides need to be located on an area,
where they can guide the paper feeding straightly without skewing. And, they
will not press the paper too much (or too loose).
In order to make a suitable gap between pillar paper guides and the load of
paper, here is a suggestion for user to try: during locating the pillars, a
157GSM paper can be used to insert between the pillar paper guide and the
load of paper. After the pillars are well pressuring the load of paper, the
157GSM paper can be removed. That can make a suitable gap between
them.