Pedestrian Pivot Barrier
MPP-112 / MPP-122 / MPP-132 / MPP-212 / MPP-222
Electrical connection
5817,0016EN / Version 00
49
8.6 Post-installation check
The following have to be checked after the electrical installation of
the pedestrian barrier:
Does the supply voltage match the specification on the type
plate?
Are the following electrical protective devices installed:
lockable 2-pole main switch, circuit breaker and leakage current
fault interrupter?
Are the pedestrian barriers connected according to electric
circuit diagram?
Are all screws firmly fixed?
Have all covers been properly assembled?
Is the protective earth conductor properly connected to the
cover?