7.3.2 Foundation plan MPP-122 and MPP-222
264
1270
264
90
90
B
90
80
280
280
720
Æ
8
A
Æ
8
Mag00434a
min. 360
6
min. 1350
990 ± 5
min. 180
60
100 ± 5
105
176
100
515
550
min. 180
min.
180
min.
180
7
1
180
800
2
A
172
40
53
53
B
40
40
5
4
3
90
20
50
Fig. 10: Foundation plan MPP-122 and MPP-222,
here illustrated MPP-122 (dimensions in mm)
For indoor applications, reinforcement is not required.
1
Foundation level and horizontal
2
Foundation depth: at least 800 mm, frost-protected
foundation depth to be adjusted to the local situation.
3
Concrete (C25/30) or corresponding continuous industrial floor.
In case of flagging make sure that the foundation anchors are
secured firmly in the foundation. If necessary, use longer anchors.
4
Foundation anchors M12x145, tightening torque: 50 Nm,
Diameter drilling hole 12 mm, drilling hole depth 90 mm
5
Have cables overlapping for approx. 2 m of the conduits
6 Passage
7
Empty conduits for mains supply and control line
Inner diameter 20 mm each