You should now have two -58s set firmly
on to the -15 plate.
With help from a strong assembly
person, lift the upper half of the cabinet
up and well over the lower cabinet. You
must be incredibly careful! You should
lift far above the lower cabinet. Lower
the upper cabinet carefully on to the
lower cabinet so that the -58s lock in to
the cutouts in the underside of the -13
plate.
Secure the top half cab to the lower half cab with (8 fasteners - 4 on either
side of the cab) 1 ½” 3/8-16 flat head fasteners with red Loctite. Put Blue
painters tape around the cabinet, over the copper to protect it.
Test fit Q7-61 (Upper Back-plate) in to the back of the Q7 to insure fit, see
Rude Dawg, DZ, Saulamander, or another experienced builder if shimming
is necessary.
38 |
P a g e
Содержание Q7
Страница 1: ...Q7 Assembly Procedure 1 P a g e...
Страница 7: ...6 P a g e...
Страница 12: ...10 P a g e...
Страница 17: ...14 P a g e...
Страница 19: ...15 P a g e...
Страница 23: ...18 P a g e...
Страница 25: ...19 P a g e...
Страница 38: ...31 P a g e...
Страница 48: ...Install BH5 in all places shown 41 P a g e...
Страница 49: ...42 P a g e...
Страница 69: ...62 P a g e...