Locate the Q7-65 Short
Rails (Blue). You should
have 6 rails total, (4) of
these short rails are to be
kept as is. The remaining
(2)
rails will need to have
their inner threaded
holes drilled out with an F
bit. The drilled out rail
will be mounted in the
“center” of these -06
braces. To start, attach
the -65 rails to the -06
braces as shown in the
images to the right.
These rails should be
fastened down with 7/8”
¼-20 fasteners with
washers and red Loctite.
Use (4) fasteners per rail
except for the center rail
in which you should use
(2).
Next install the Q7-03
Brace (Pink). This will
have to slide in sideways
and be inserted through
the (2) Q7-06s. Once
through, the cut-outs in
the -03 brace should line
up with the -06 braces.
3 |
P a g e
Содержание Q7
Страница 1: ...Q7 Assembly Procedure 1 P a g e...
Страница 7: ...6 P a g e...
Страница 12: ...10 P a g e...
Страница 17: ...14 P a g e...
Страница 19: ...15 P a g e...
Страница 23: ...18 P a g e...
Страница 25: ...19 P a g e...
Страница 38: ...31 P a g e...
Страница 48: ...Install BH5 in all places shown 41 P a g e...
Страница 49: ...42 P a g e...
Страница 69: ...62 P a g e...