MAGA s.r.o., S. Kollára 86, Čerenčany 979 01, Slovak Republic.
+421 917 465 298, [email protected],www.magasro.sk
Made in Slovakia
16
5 BOILER USE
5.1 PREPARING THE BOILER FOR OPERATION
Before the start of the boiler operation, make sure that the system is filled with water, vented
and that the heating water pressure does not drop. Check that the chimney pipe is firmly
connected and that there is no smoke leakage. Check that the boiler and safety thermostat
sensors are located in the boiler wells and that they show real values. The boiler must be
operated in accordance with the instructions given in this manual in order to achieve correct
operation. Operation may only be performed by an adult trained person.
If the boiler has been out of operation for a long time (switched off, faulty), it is necessary to take
extra care when restarting it. When the boiler is shut down for a long time, the pump may be
blocked, water may leak from the system or the boiler may freeze in the winter
5.2 HEATING, OPERATION AND REFUELING
Cleaning arm
Fuel chamber door
Ignition door
Lower door
Ashtray