ASSEMBLING AND INSTALLATION
The boiler may only be installed by a person with a valid authorization for the installation and
assembly of heating equipment. A project that complies with the applicable regulations must be
prepared for the installation. Before installing the boiler, the installer is obliged to check whether
the data on the boiler nameplate agree with the data in the project and in the accompanying
documentation of the boiler. The boiler connection must comply with the applicable regulations,
standards, ordinances and these operating instructions.
NOTICE:
The manufacturer is not liable for damage caused by incorrect wiring or incorrect
operation!
4.1
MANIPULATION
The boiler is delivered placed on a pallet. Always handle the boiler on a pallet until the boiler is
removed from the pallet immediately at the installation site. This can be done with the help of a
handling truck or with a crane and a lifting eye, which is not part of the delivery (recommended
specification: hanging eye M20 DIN 580). The suspension eye is screwed into a pre-prepared nut
welded on the top of the boiler intended for hanging the boiler. Before hanging the boiler on the
hanging eye, it is necessary to remove the upper lid of the boiler.
Method of handling the boiler using a hanging eye