MAGA s.r.o., S. Kollára 86, Čerenčany 979 01, Slovak Republic.
+421 917 465 298, [email protected],www.magasro.sk
Made in Slovakia
17
1. Open the loading door. Check the height of the ash in the loading chamber. If the height of the
ash exceeds 50 mm from the bottom of the chamber, clean the loading chamber. If there are
wooden carbons in the chamber, it is not necessary to remove them, they will facilitate heating.
However, the ash must always be removed. For cleaning, it is ideal to use a brush and collect the
ash towards the nozzle so that it falls into the combustion chamber of the boiler. Always clean
the combustion chamber before each additional heating of the boiler!
WARNING!
If the combustion chamber is not sufficiently cleaned, the volume of the combustion
chamber
will be rapidly reduced, which can lead to imperfect combustion and dangerous conditions.
Under no circumstances operate the boiler without a cleaned combustion chamber!
2. Insert one layer of medium-thick fields (approx. 40 mm
–
60 mm) into the loading chamber on
the refractory fitting so that neither air access to the nozzle nor primary air is blocked.
3. Place paper or cardboard or other suitable wood-burning agents (eg solid alcohol lighter) on
the wood thus prepared.
4. Finely place chips on cardboard or paper, which after firing will form a base layer (carbons) for
firing piece wood
5. Start the controller.
6. Ignite the prepared layer at the bottom front and close the door to approx. 15 mm.
7. Wait 10-15 minutes for the base layer to burn sufficiently to allow the piece of wood to be
applied
8. We attach the piece of wood complete
9. Close the door. Heating is complete. If you are not sure whether the heating was successful,
monitor the flue gas temperature. If the heating has been carried out correctly, the flue gas
temperature will rise.
5.3 OPERATION
The boiler is controlled according to several parameters in normal operation. The boiler is ideally
always operated so that it goes at 100% output, which achieves the highest efficiency,
combustion stability, minimal combustion residues and trouble-free operation. Such operation
is most easily achieved when the boiler is connected to a storage tank of suitable volume, which
it gradually accumulates. Here, the rule must be observed that the difference between the set
boiler temperature and the return temperature is at least 15 °C, so that the boiler does not reach
the set boiler temperature during charging of the storage tank and thus does not switch to
attenuation mode before the storage tank is charged. Boiler operation and control is explained
in more detail below.
5.4 REFUELING
WARNING!
During operation, you must open the loading chamber door gradually so that any
smoke coming out of the chamber does not catch your eyes. We always refuel only when the