HEADER OPERATION – D SERIES
Form # 169304
70
Model Year - 2009
6.5 D SERIES HEADER OPERATION
6.5.1
Header Attachment - D Series
a. If not installed, attach draper header boots
(supplied with header) to tractor lift linkage as
follows:
1. Remove pin (A) from boot (B).
2. Locate boot (B) on lift linkage (C) and
reinstall pin (A). Pin may be installed from
either side of boot.
3. Secure pin (A) with hairpin.
4. Repeat for opposite side.
b. Remove hairpin on pins (D) and remove pins
from header legs.
CAUTION
Check to be sure all bystanders have cleared
the area.
c. Start the engine and activate header down
button on the GSL to fully retract header lift
cylinders.
d. Slowly drive tractor forward so that boots (B)
enter header legs (E). Continue to drive slowly
forward until linkages contact support plates in
the lower header legs, and header nudges
forward.
e. Check that linkages are properly engaged in
header legs, contacting support plates.
(continued next page)
HEADER UP
HEADER TILT UP
HEADER DOWN
HEADER
TILT DOWN
B
E
B
C
A
D