HEADER OPERATION – D SERIES
Form 169304
71
Model Year - 2009
f. Connect center link as follows:
MECHANICAL LINK
1. Loosen nut (G) and rotate barrel (H) to
adjust length so that link lines up with
header bracket.
2. Install pin (J) and secure with cotter pin.
3. Adjust link to required length for proper
header angle by rotating barrel (H). Tighten
nut (G) against barrel. A slight tap with a
hammer is sufficient.
HYDRAULIC LINK – OPTION
1. Activate header tilt cylinder switches on GSL
to position center link cylinder so that it can
connect to header.
2. Push down on rod end of link cylinder (K)
until hook engages pin on header and is
locked.
g. Raise the header fully with the header up switch
on the GSL. Stop engine and remove key.
DANGER
To avoid bodily injury from fall of raised
header, always engage header lift cylinder
stops when working on or around raised
header.
h. Engage lift cylinder stops on both lift cylinders.
i. Install pin (D) through header leg, (engaging U-
bracket in lift linkage) on both sides and secure
with hairpin.
j. Raise header stand (L) to storage position by
pulling pin (M) and lifting stand into uppermost
position. Release pin (M).
(continued next page)
L
M
D
HEADER UP
HEA
HEADER DOWN
HEADER
TILT DOWN
K
J
H
G