background image

User Manual LOCC-Box-Net, LOCC-Pads 

28 

 

LOCC-Box-Net_1.61_HB_EN 

 

5  Reference 

The follow table shows an overview of all gateway user manuals. 
 

Gateway 

Article number 

User manual 

EtherCAT, USB 

716456 

EtherCAT-Gateway 716456_1.1_HB_DE 

Profinet-IO, USB 

716457 

Profinet-IO-Gateway 716457_1.00_HB_DE 

Profibus-DB, USB 

716458 

Profibus-DP-Gateway 716458_1.0_HB_DE 

CANopen, RS232, USB 

716459 

CANopen-Gateway 716459_1.0_HB_DE 

 
 
 
 
 
 
 
 

 

 

 

 

 

 

 

 

Scope of the document 

 

The gateways may include software licensed by 3rd parties. The following third party intellectual 
property (IP) notices are provided to comply with the terms of such licenses. 

Lütze Gateway 716459 Firmware 

The firmware of the Gateway uses the FreeRTOSTM operating system which is developed under the 
terms of the GPL. As a special exception to the GPL, the copyright holder of FreeRTOS gives the 
permission to link FreeRTOS with independent modules that communicate with FreeRTOS solely 
through the FreeRTOS API interface, regardless of the license terms of these independent modules, 
and to copy and distribute the resulting combined work without being obliged to provide the source 
code of these proprietary modules. See the licensing section of h ttp://www.freeRTOS.org for full 
details. 

 

1)  Windows, Windows 2000, Windows XP und Windows Vista are registered trademarks of the  
 

Microsoft Corporation. 

 

2)  Program is based in part on the work of the Qwt project (http://qwt.sf.net). 

Содержание 716403

Страница 1: ...User Manual User Manual LOCC Box Net LOCC Pads Description of LOCC Box Net and LOCC Pads LOCC Box Net LOCC Pads Description of LOCC Box Net and LOCC Pads Version 1 61...

Страница 2: ...t to be documented in every case This manual and the contained information have been arranged with the utmost care The Friedrich L tze GmbH disclaims liability for literal mistakes and other errors or...

Страница 3: ...n assignment 10 2 2 4 Function Displays and Settings 11 2 2 5 Installation 12 2 3 Technical data 12 2 3 1 LOCC Box Net Control unit 12 2 3 2 Supply set Supply terminal and end block 716425 13 2 4 Char...

Страница 4: ...C Box Net_1 61_HB_EN 3 5 8 Extra LOCC Box Config 23 3 5 9 Extra LOCC Box Info 24 3 5 10 Extra LOCC Box Logging 25 3 5 11 Extra LOCC Box Reset 25 3 6 Configuration Saving Open 25 3 6 1 Saving 26 3 6 2...

Страница 5: ...will be in the next issue We would appreciate any kind of suggestion and contributions on your part All warranty and liability claims shall be excluded by Friedrich L tze GmbH in case of damages caus...

Страница 6: ...work on the modules Installation Commissioning Operating Maintenance Regarding the safety related notes qualified employees are people who are allowed to operate with the modules systems and the curre...

Страница 7: ...Energy management Preventive maintenance Analog characteristic with thermic and magnetic range Single or centralized fault indication Status display for normal operation 90 and 100 load and error Rem...

Страница 8: ...ation 2 2 1 System Assembly For assembly mount the products on a top hat rail according to EN 50022 There are two possibilities A Operating with supply set 716425 Supply terminal and End block Snap on...

Страница 9: ...eklemmen vom Typ 716421 Somit ist ein Maximalausbau mit 160A m glich begrenzt durch die 3x10mm Kupferschiene B Direct voltage supply of the control unit Instead of powering the system via the supply t...

Страница 10: ...C Box Net LOCC Pads 10 LOCC Box Net_1 61_HB_EN 2 2 3 Dimension and Pin assignment LOCC Box 716410 LOCC Box 716411 1 Output 2 Control input Set Reset 3 Status output 4 Communication 5 0V 6 Supply alter...

Страница 11: ...e supply of the module Load DC 12 24V maximum DC 10A Status indication Operation Description LED green ON Function ok output is active LED red OFF The module is switched off or acknowledged via the bu...

Страница 12: ...Rated switch off current DC 1A DC 10 A via switch in steps of 1A Switch off times 1 fast acting 2 middle acting 3 slow acting_1 4 slow acting_2 5 9 slow acting_3 Curve 10 is via LOCC Pads programmabl...

Страница 13: ...UL 94 V0 NFF I2 F2 Mounting snap on TS 35 acc EN 50022 Protection level IP 20 Mounting position any Installation technology spring termination 0 33mm2 10 0mm2 0 33mm 6 0mm Operation temperature 25 C...

Страница 14: ...uct state E07 end of August 2009 and higher we provide additional the switch position 4 slow acting_2 and 5 slow acting_3 All other switching positions are like the last one 1 Switch setting character...

Страница 15: ...er installing the software LOCC Pads otherwise an installation of the device driver is not possible The LOCC Pads software is also needed for the communication via RS232 and CANopen in order to set th...

Страница 16: ...r The setup chooses automatically the presettled folder where LOCC Pads have to be installed Click Next to continue or Browse if you wish to choose another folder Note the necessary disc space 7 Choos...

Страница 17: ...LOCC Pads to start LOCC Pads after installation Click Finish to complete the installation 3 3 USB connection The picture shows the connection between LOCC Box Net and a computer via the USB connectio...

Страница 18: ...CC Pads symbol on the desktop or by Start Programs LOCC Pads LOCC Pads LOCC Pads starts in an inactive mode With LOCC Pads it is possible to make adjustments in the COM settings to download the firmwa...

Страница 19: ...ateway With the button Refresh it is possible to update the values and to save them with Set OK is used to close the window new adjustments are not saved At the top the currently firmware is additiona...

Страница 20: ...is suggested The number can be changed to any other number To assign any module to that number press the push button of that module for 1 sec The displayed number increments by 1 and the next module c...

Страница 21: ...are disconnected and are no longer updated Confirm with Yes to stop the logging or with No to continue With Yes it is possible to confirm if the record has to be saved in Excel Format CSV clicking No...

Страница 22: ...ng according to the current flow This means the bigger the over current the smaller the time until the LOCC Box Net switches off the load On Off Provides the possibility to switch the modules ON OFF o...

Страница 23: ...switched on to the supply voltage Operating hours ON h Indicates the total time how long the load was or is switched on 3 5 6 Window LOCC Box Current Voltage The represented Plotter shows the chronolo...

Страница 24: ...or switching the modules on off This is possible by adjusting the impulse length or the level The impulse length on off corresponds the default setting 716400 716401 716410 Switch ON Characteristic Th...

Страница 25: ...lt status 0 by resetting Comments settings and counters are not reset It is useful if using the modules with node numbers in a new order This operation is password protected to avoid an accidentally r...

Страница 26: ...lick Abort Invalid configuration like rotary switch settings of the current or characteristics or not existing node numbers are alert by a message window Example The rotary switch I is set to 2 on nod...

Страница 27: ...LOCC Box BKR 7 6429 5 Jumper comb 8pole 6A blue 716430 LOCC Box BKB 7 6430 5 Jumper comb 16pole 6A white 716438 LOCC Box BKW 7 6438 5 Jumper comb 16pole 6A red 716439 LOCC Box BKW 7 6439 5 Jumper comb...

Страница 28: ...enses L tze Gateway 716459 Firmware The firmware of the Gateway uses the FreeRTOSTM operating system which is developed under the terms of the GPL As a special exception to the GPL the copyright holde...

Отзывы: