®
For additional information, see the complete installation and operation guide at
www.lutron.com/qs
GRAFIK Eye
®
QS Control Unit Quick Installation and Operation Guide 5
Wiring the GRAFIK Eye
®
QS Control Unit:
Line Voltage Wiring Details (continued)
Step 4: Connect line voltage and loads
to control unit.
• Strip 8 mm of insulation off the line
voltage/mains cables in the wallbox.
• Connect the line voltage/mains, ground,
and load wires to the appropriate
terminals on the back of the control unit.
L: Hot/Live
N: Neutral
: Ground
Terminals 1-6: Dimmed/Switched
line voltage outputs
8 mm
The recommended installation torque
is 0.6 N
∙m for line voltage/mains
connections and 0.6 N
∙m for the earth/
ground connection.
Note:
See the zone setup section for
a list of compatible load types and
instructions for programming the
GRAFIK Eye
®
QS control unit to properly
recognize them.
Notice: Risk of damage to unit.
GRAFIK Eye
®
QS control units must be in stalled by
a qual i fied electrician in accordance with all applica ble reg u la tions and building codes.
Im prop er wiring can result in dam age to control units or oth er equipment.
Note:
To avoid over heat ing and pos si ble damage to equipment, do not install control
units to dim re cep ta cles, mo tor-op erated ap pli ances, or flu o res cent lighting not
equipped with Lutron Hi-lume
®
, Eco-10
®
, Tu-Wire
®
, electron ic dim ming ballasts, or
other devices approved for your location. In dimmed mag net ic low-voltage cir cuits,
you can pre vent trans former overheating and failure by avoid ing excessively high cur-
rent flow. Do not op erate control units with any lamps re moved or burned out; re place
any burned out lamps imme di ate ly; use only transform ers that in cor po rate ther mal
pro tection or fused pri ma ry wind ings. Control units are de signed for res i den tial and
commercial use, for indoor use only.