the  efficient  ventilation  of  the  boiler  room.  It  is  forbidden  to  use  mechanical  exhaust 
ventilation systems.  
The  boiler  room  should  also  be  fitted  with  a  floor  drain  connected  to  the  sewerage  system 
and  a  draw–off  tap  connected  to  the  water  supply  system.  The  entrance  door  to  the  room 
must open to the outside. 
The boiler should be placed on a purpose–built foundation or directly on the floor of the boiler 
room. The base upon which it is located must be made from inflammable materials and must 
be able to support the weight of the boiler when it is filled with water. 
 
 

2.2.  Requirements concerning the electrical system 

 

 

The boiler is intended for usage with ancillary devices powered from a single–phase 
alternating current line with a rated voltage of 230 V/50 Hz. 

 

The  boiler  and  ancillary  devices  must  be  connected  to  an  electrical  outlet  with  a 
ground terminal. 

 
 
 

 

The entirety of electrical connections must be made in accordance with currently valid 
regulations and the electrical diagrams delivered together with the boiler and ancillary 
devices. 

 

No other equipment may be added to the line to which the boiler and ancillary devices 
are connected. 

 

Repairs,  irrespective  of  their  nature  and  scope,  may  be  carried  out  solely  following 
disconnection of the power supply. 

 

Further, repairs may be carried out EXCLUSIVELY by the Authorised Service Centre 
or duly authorised persons. 

 

Any tampering, structural modifications, or the performance of repairs by the user or 
unauthorised  third  parties  shall  result  in  IMMEDIATE  VOIDANCE  OF  THE 
GUARANTEE, and is also dangerous, as it substantially increases the risk of serious 
injury or even death!    

 
 

2.3.  Guidelines concerning selection of the expansion vessel 

 
 

Bio-max  Plus  boilers  can  be  used  in  either  open  central  heating  systems  protected 

against pressure increases by an open (overflow) expansion vessel or closed central heating 
systems protected by a pressure (closed) expansion vessel. All boilers intended for operation 
in  closed  systems  are  factory–fitted  with  a  cooling  coil  pipe.  The  coil  pipe  and  thermal 
protection device must be duly connected.  
The appropriate expansion vessel should be selected by the system designer.  
The  expansion  vessel  should  be  installed  by  the  system  contractor,  who  must  proceed  in 
accordance with the currently valid regulations. 
 
 

 

ATTENTION! 

The ground terminal must be effectively grounded, while in the case of an electrical 

system secured with a residual current circuit breaker it must be effectively grounded 

if the electrical outlet is connected to only two conductors. 

 

Содержание BIO-MAX PLUS

Страница 1: ...N MANUAL ul G wna 51 B Krosno 62 Heating boiler with automatic fuel delivery BIO MAX PLUS Series of types 70 300 kW TECHNICAL INSTRUCTION USER MANUAL AND INSTALLATION MANUAL LUMO Technika Grzewcza Sp...

Страница 2: ...quality 14 4 7 Connection to the electrical system 14 4 8 Connection to the domestic hot water exchanger option 17 4 9 Connection of the boiler to a chimney stack system 18 5 OPERATION 19 5 1 Prepara...

Страница 3: ...constant development and improvement of our products we would ask you to send us all and any comments concerning the functioning of our appliances and the level of service provided by our partners We...

Страница 4: ...two weeks of the date of initial start up shall void the guarantee for your newly purchased appliance thus resulting in the user being required to cover the entirety of costs of all and any repair wor...

Страница 5: ...hen there is a risk of water freezing in the system Water should also be drained in the event of a leak which may result in flooding ATTENTION It is forbidden to tamper with safety devices Only origin...

Страница 6: ...e of their nature and scope may be carried out solely following disconnection of the power supply Further repairs may be carried out EXCLUSIVELY by the Authorised Service Centre or duly authorised per...

Страница 7: ...t while in the upper part is a large and easily accessible washout hole which facilitates cleaning of the heat exchanger and the smoke tubes A tray for ash is located in the bottom part of the boiler...

Страница 8: ...8 Figure No 2 Component elements of the boiler Figure No 2 Component elements of the boiler...

Страница 9: ...9...

Страница 10: ...10 3 2 Technical parameters Figure No 3 Boiler installation dimensions...

Страница 11: ...factured in accordance with PN EN ISO 17225 2 2014 07 Voltage V Hz 230 50 Electrical terminal A 6 Power consumption in standby W 3 Power consumption under nominal operating conditions W 234 278 630 66...

Страница 12: ...ther the phase conductor L is correctly located and whether the outlet has a ground terminal that is in good working order 4 2 Location of the boiler The boiler should be located in a separate room pu...

Страница 13: ...775 4 3 Installation of the burner Installation of the burner consists solely in attaching it by means of screws to the boiler door The pertinent detailed technical information screw thread diameters...

Страница 14: ...n Table No 1 These stub connectors and their corresponding joints are used to connect the boiler to the central heating system in the appropriate manner so as not to mix up supply with return for exam...

Страница 15: ...required 4 6 Guidelines concerning water quality The quality of water used to fill the boiler and the system is of critical importance for their longevity and trouble free operation Inappropriate boil...

Страница 16: ...16 Figure No 7 Wiring diagram ecoMAX860P Standard and ecoMAX860P Touch...

Страница 17: ...eather based temperature sensor type CT6 P RS return water temperature sensor type CT4 FS feeding mechanism temperature sensor type CT4 OS optical flame brightness sensor BT boiler temperature sensor...

Страница 18: ...RM2 room thermostat mixer 2 RM3 room thermostat mixer 3 L N PE power supply 230 V GR grounding strip PM2 PM3 pump mixer 2 3 SM2 SM3 servo motor mixer 2 3 CPU control A executory module of the ecoMAX8...

Страница 19: ...ned by the duly authorised system designer The following figure presents an exemplary diagram of a system comprising a LUMO WCW hot domestic water exchanger and a Bio max Plus boiler Figure No 10 Exem...

Страница 20: ...cts being released by the boiler into the boiler room and the concentration of CO in the combustion chamber While Bio max Plus boilers operate in their lower power range the temperature of flue gases...

Страница 21: ...e boiler it is necessary to perform a fresh inspection of the appliance and its ancillary devices and in particular to carry out an internal inspection of the boiler water filling inspection to carry...

Страница 22: ...manuals delivered together with these two devices During initial start up there may occur the phenomenon of boiler sweating In this event it will be necessary to intensify the combustion process in o...

Страница 23: ...its ancillary devices at least once a year preferably before the start of the heating season The entirety of repairs inspections adjustments and maintenance may be performed solely by the Authorised S...

Страница 24: ...ce a year every 12 months Inspection of the functioning of regulating and safety devices including the safety valve and the safety temperature limiter STB Inspection of the ventilation system Inspecti...

Страница 25: ...urner in order to gain access to the combustion chamber and the smoke tubes Remove the flue gas turbulators coils from the smoke tubes Use a round steel brush seated on a cleaning rod to carefully cle...

Страница 26: ...y of activities described under the present point are to be performed solely by the Authorised Service Centre 6 4 1 General guidelines During each inspection and maintenance operation performed on the...

Страница 27: ...manufacturer must be followed at all times during such checks All and any failures caused by the incorrect functioning of the burner or brought about intentionally are displayed on the control panel...

Страница 28: ...s and leads The controller has got damp Damaged display Check the electrical connection of the boiler Check the correctness of installation of plugs and whether the controller has been properly connec...

Страница 29: ...29...

Отзывы: