Deaerate, whenever necessary, the central heating system and the boiler.
−
Once every 3 months clean the surfaces of the boiler exchanger and the burner
furnace.
−
Maintain the room in which the boiler is installed in a state of order and
cleanliness, and not allow it to be used for any other purposes.
−
Once every two days check the level of fuel in the tank.
−
Regularly, at least once a week, inspect the ash container and if necessary
empty its contents.
6.3. Maintenance activities performed by the Authorised Service Centre
ATTENTION!
The entirety of activities described under the present point are to be performed solely
by the Authorised Service Centre!
Regular and professional boiler maintenance is indispensable in order to ensure the
proper and reliable functioning of the appliance, guarantees optimal fuel
consumption, and helps protect the natural environment against the toxic processes
which occur in the course of combustion.
6.3.1. Recommended intervals and scope of service operations
Once a year (every 12 months):
−
Inspection of the functioning of regulating and safety devices, including the
safety valve and the safety temperature limiter (STB).
−
Inspection of the ventilation system.
−
Inspection of the leaktightness and adherence of doors and washout holes, and
of the efficiency of packing cords.
−
Inspection of the insulating elements of the boiler.
−
Flue gas analysis.
−
Cleaning the part of the boiler exchanger which comes into contact with flue
gases.
−
Checking the cleanness and technical condition of elements of the burner, in
particular the following: furnace, motoreducers, fans, photocells, heater,
downpipe and spirals of the external and internal feeding mechanisms.
−
Adjustment of the burner and inspection of the correctness of settings of boiler
and burner automatics.
ATTENTION!
Flue ducts and ventilation channels must be periodically inspected and cleaned by
technicians from the COMPETENT PROFESSIONAL ORGANISATION. It is necessary
for this operation be carried out once every 3 months (Regulation of the Minister of
Internal Affairs and Administration of 7 June 2010 on the Fire Protection of Buildings,
other Building Structures, and Premises – Journal of Laws No. 109, Item 719, of 2010).
Содержание BIO-MAX PLUS
Страница 8: ...8 Figure No 2 Component elements of the boiler Figure No 2 Component elements of the boiler...
Страница 9: ...9...
Страница 10: ...10 3 2 Technical parameters Figure No 3 Boiler installation dimensions...
Страница 16: ...16 Figure No 7 Wiring diagram ecoMAX860P Standard and ecoMAX860P Touch...
Страница 29: ...29...