5.3. Situations in which start–up of the boiler is prohibited
It is forbidden to start–up the boiler in the following instances:
If acceptance testing by a unit of the Office of Technical Supervision is required, but
has not been performed.
The burner, fuel feeding mechanism or boiler controller is damaged, or its proper
functioning is impaired.
It has been determined that the flue gas discharge system is functioning incorrectly.
There is no water or an insufficient quantity of water in the boiler.
It has been determined that a safety device or measurement apparatus is functioning
incorrectly.
There exists a risk of fire or any other risk to human health and life.
6.
INSPECTIONS AND MAINTENANCE
CRITICALLY IMPORTANT!
Before commencing any maintenance operations, it is necessary to disconnect the
boiler and its ancillary devices from the power supply, and if necessary wait until they
completely cool down.
6.1. General guidelines
−
It is recommended to carry out a comprehensive inspection and perform
maintenance operations on the boiler and its ancillary devices at least once a
year, preferably before the start of the heating season.
−
The entirety of repairs, inspections, adjustments and maintenance may be
performed solely by the Authorised Service Centre.
−
In the course of every inspection and maintenance operation it is necessary to
verify the correct functioning of all safety systems and the leaktightness of the
water system, the flue gas discharge system, and the ventilation system.
−
The above operations are not considered as guarantee repairs.
−
The boiler room should at all times be maintained in a state of order and
cleanliness.
−
In the event of any irregularities in the functioning of the boiler, burner, controller
or any other ancillary device installed in the boiler room, particularly if the device
in question impacts usage safety, it is necessary to immediately remove the
malfunctioning component or contact the Authorised Service Centre for the
purpose of carrying out repairs.
6.2. Maintenance activities which may be performed by the user
The user of the appliance should himself perform the following:
−
Periodically – at least once a year – clean the water filters.
−
At least once every 3 months inspect the water level in the central heating
system and, if necessary, add water.
Содержание BIO-MAX PLUS
Страница 8: ...8 Figure No 2 Component elements of the boiler Figure No 2 Component elements of the boiler...
Страница 9: ...9...
Страница 10: ...10 3 2 Technical parameters Figure No 3 Boiler installation dimensions...
Страница 16: ...16 Figure No 7 Wiring diagram ecoMAX860P Standard and ecoMAX860P Touch...
Страница 29: ...29...