Lucent Technologies Lineage
®
2000 50A Ferroresonant Rectifier J85502B-1
2 - Table of Contents
Issue 6 May 1999
Installing or Adding a Rectifier
Installing Plant Control Cable Assembly for a Lucent
Converting AC Voltage (Optional)
Initial Battery Charging (Optional)
Battery Plant Simulator Test Set
Preparation for Testing Off Line
Regulation (NL/FL) Test (Off Line)
Rectifier Failure Alarm/Fuse Alarm Test (Off Line)
Backup High Voltage Shutdown (HVSD) Test
Selective High Voltage Shutdown (SHVSD) and
Meter Calibration Test (Off Line)
Test for 434A or 434B Circuit Module
Bringing the Rectifier On Line
Rectifier Failure Alarm/Fuse Alarm Test (On Line)
Isolated Current Measuring (VI) Test (MCS or