Installation 4 - 13
Step H - Battery Connections, Disconnect Installation &
Test:
Remove all fuses from CP5 Fuse Board. Confirm that the output
circuit breakers of all rectifiers and all distribution breakers are
open.
Interconnect the battery strings as instructed by the battery
manual or other manufacturer's documentation.
Run all cables from the battery and return bus bars to the battery
strings by first connecting them to the bus bars in the dc
distribution subsystem. For suggested cable routing within the
dc distribution see the H569-416 drawing. Replace the dc
distribution cover panel on the plant framework after all
connections have been made at the plant bus bars.
Terminate the cables from the dc distribution at each battery
string according to the manufacturer's documentation. Measure
the resistance between the two ends of any battery string to
verify that the circuit is open. Close the last remaining part of the
battery circuit on each string (intercell connector).
Reinsert all fuses in CP5 Fuse Board. Match the fuse ratings and
positions as indicated on the distribution cover panel.
DANGER
The next step in this procedure will apply battery power to the
battery plant. Before contacting any uninsulated conductor
surfaces, always use a voltmeter to insure that no voltage, or
the expected voltage, is present.
Important
Leave one intercell connection out so that there is an open
circuit between the two terminals of each string before
proceeding.
Note
The white indicators on F1 through F11 represent a 1-1/3 amp
rating and the orange indicator on F12 represents a 2 amp
rating.